Laserfiche WebLink
<br />- <br /> <br /> <br />Upper Platte and Beaver Canal Company <br />March 22, 2002 <br /> <br />Page 2 <br /> <br />3, You must adhere to the CWCB Desiqn and Construction Administration Procedures, Tim <br />Feehan will contacted you regarding the CWCB requirements, Tim will make a final <br />construction inspection, which will be the basis for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for an Emergency Loan from the <br />Colorado Water Conservation Board. <br /> <br /> <br />. <br /> <br />~~ <br /> <br />Mi rlet, PE, Chief <br />W'1tej7Supply Planning and Finance Section <br />Cottlfado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: UPBCC 302memo <br /> <br />cc (wIAttachmen!): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservatlon Board <br />Mr. Jack Odor, r.E" PO Box 974, Ft. Mor9an, CO 80701 <br />CWCB Section 13 Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: wp51\Proj-NewlUPBCC 3021tr <br />