My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00776 App Letter
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00776 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 3:25:36 PM
Creation date
12/19/2006 9:46:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150096
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman SP"eet, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br />www.cwcb.state.co.us <br /> <br /> <br />March 22, 2002 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. Philip Mortensen, Preslclent <br />Upper Platte and Beaver Canal Co. <br />P.O. Box 581 <br />Brush, CO 80723 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: <br /> <br />Diversion Rehabilitation <br />Emergency Loan Approval <br /> <br />Dear,Mr, Mortensen, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) approved your <br />Emergency Loan request on March 21, 2002, The loan is for rehabilitation of your diversion <br />structure on the South Piatte River, near Fort Morgan, <br /> <br />The Board approved an Emergency Loan from the Construction Fund in a maximum amount of <br />$83,000, The loan terms are 2,25% for 10 years, The Board also approved a grant in amount of <br />$2,500 to pay for up to half the cost of the feasibility study, I have attached a copy of the updated <br />Board memo concerning the Upper Plate and Beaver Canal Company. Please refer to page 4 of <br />that memo and to the section "Action taken by the CWCB March 21, 2002." <br /> <br />When the Board approved this Emergency loan it attached several conditions: <br /> <br />1. A Feasibilitv Study is required, We understand that Jack Odor, P.E" has drafted the study, <br />which is scheduled for completion in April 2002. The study must be completed and meet the <br />requirements of the CWCB Construction Fund Guidelines for feasibility studies, <br /> <br />2. An approved contract must be in place before funds can be advanced. Jan IlIian has placed <br />this project on our contracting "hot list" and has initiated the loan contracting process. Our goal <br />is to have this loan contract ready for final signature as soon as possible, <br />
The URL can be used to link to this page
Your browser does not support the video tag.