My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00310 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00310 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:54 AM
Creation date
12/8/2006 1:22:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153740
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
EIA
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Idaho Springs <br />William V.K. Macy, Mayor <br />November 22, 1995 <br /> <br />2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />< <br /> <br />and guidance, and will be reviewing the study. A sample Feasibility Study (and computer <br />disk, Word perfect 5.1) is attached. The study must be in draft form, and submitted to <br />the CWCB by January 8. 1996, in order for your loans to receive final consideration at <br />the January 23, 1996 CWCS meeting. <br /> <br />c. An approved contract must be in Place before the construction work can proceed. Jan <br />Illian of this office (303-866-3441) will be available to draft the contract after your loans <br />have received final approval or recommendation in January 1996. You should call Jan <br />as soon as possible after the January meeting to discuss the contracting procedure, and to <br />initiate the contract. It usually takes about 3 to 6 months to complete a loan contract. <br />No CWCB emergency funds can be disbursed until the Emergency Loan contact <br />($130,000) is signed by all parties. Nl) additional CWCB funds can be disbursed until the <br />Construction Fund Bill has been signed by the Governor and your standard loan contact <br />($1.5 million) is signed by all parties. <br /> <br />d. You must adhere to the CWCB Design and Construction Administration Procedures. <br />Please contact Mike Serlet of this office (303-866-3441) before you start design, or bid <br />construction of the project. Mike will explain our contractor bidding and bonding <br />requirements, and will make field inspections during construction. His inspections will <br />be the basis of monthly pay estimates for disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. John Van Sciver will continue to work closely <br />with you through the Feasibility and final apl>roval process for your loan. Please call him at any <br />time if you need assistance. <br /> <br />Sincerely, <br /> <br />~f~ <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />JVS:jvs <br />Attachments: <br /> <br />I. updated Memo 18j.nov <br />2. eWeB Guidelines for Financial Assistance <br />3. Sample Feasibility Study (and Disk). <br /> <br />cc (wI Attachment I.): <br />Mr. David L. Harrison. Chairman eWeB <br />cc (w/o Attachments): <br />John Van Sciver. eWeB Staff <br />Bill Green. eWeB Staff <br />Mike Serlet, eWeB Staff <br />Jan Illian, eWeB Staff <br />C\WPS lVOHN\18jNOV96.1tr <br />
The URL can be used to link to this page
Your browser does not support the video tag.