Laserfiche WebLink
<br />- <br /> <br /> <br />Riverside Ditch and Alien Extension Company <br />July 24, 2002 <br /> <br /> <br />Page 2 <br /> <br />3. You must adhere to the CWCB Desion and Construction Administration Procedures. Tim <br />Feehan will contact you regarding the CWCB requirements concerning project bidding, design, <br />and construction. Tim will make construction inspections, which will be the basis of the pay <br />estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />Attacl1menls: <br /> <br />~JJ <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />cc (w/Attachment): <br /> <br />Updated Memo: RlversideDilch 702memo <br /> <br />Mr, Harold Miskel, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51\Proj.NewIRlversldeDitch 7021tr <br />