My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12248
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:23 PM
Creation date
10/12/2006 5:28:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1983
Title
Monthly Progress Report - Aquatrain Project - September 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(~ <br /> <br />. <br /> <br />. <br /> <br />~ J <br />w:.::t' <br />..-t <br /> <br />(ui <br /> <br />6.2 ANTICIPATED OCTOBER EVENTS <br /> <br />C) <br /> <br />Submit to Forest Service (Region IV) the revised section <br />of Corridor Study dealing with the Castle Dale to Intermountain <br />Powerplant corridors for their review. <br /> <br />Submit Forest Service/Reclamation Memorandum of Understanding <br />to Regional Offices for formal review. <br /> <br />Complete Project Preliminary Report. <br /> <br />Finish Work Order #2 to BLM/Reclamation Interagency Agreement. <br /> <br />Request from Upper Colorado Region, UC-150, a formal opinion <br />on required environmental clearances for the slurry test <br />loop. <br /> <br />6.3 ANTICIPATED NOVEMBER EVENTS <br /> <br />Submit final Corridor Study comments from Forest Service <br />Region 4 to Division of EIS Services for inclusion in the <br />report. <br /> <br />Receive "review to print" copy of Corridor Study from Division <br />of EIS Services. <br /> <br />Complete and sign Forest Service/Reclamation Memorandum <br />of Understanding. <br /> <br />Begin work on Project Description for the EIS. <br /> <br />Define required energy management studies for the EIS. <br /> <br />7.0 SUBTEAM: PLANNING COORDINATION/REPORTS/PUBLIC INVOLVEMENT <br />(Stefanec) <br /> <br />7.1 SEPTEMBER EVENTS <br /> <br />Very productive meetings this month with officials in the <br />Las Vegas Valley area: <br /> <br />Clark County: Discussed all possible alignments through <br />County area. Both the West Side Las Vegas alternative <br />and the East Las Vegas variation alternative alignment <br />areas were toured. <br /> <br />Nellis Air Force Base: Discussed Nellis sensitivities <br />of which this Project must be aware. Specific routing <br />possibilities discussed in some detail. Base officials <br />were most cooperative and interested in continued productive <br />dialogue. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.