My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12248
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:23 PM
Creation date
10/12/2006 5:28:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1983
Title
Monthly Progress Report - Aquatrain Project - September 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t:-:l <br />~ .1 <br />~ <br />.......-j <br />(.> <br />C) <br /> <br />. <br /> <br />. <br /> <br />reserves without finding a commercial outlet for the CO . <br />American Quasar has indicated an interest in supplying E02 <br />to Aquatrain and discussions are underway. . <br /> <br />IECO (International Engineering Company) completed capital <br />and O&M data for staged 30 and 60 million ton per year systems. <br />Some revisions still underway. <br /> <br />5.2 ANTICIPATED OCTOBER EVENTS <br /> <br />Continue identifying CO2 sources. <br /> <br />Begin marketing studies for CO2 uses in enhanced oil recovery <br />in Texas and California. <br /> <br />Followup on possible joint venture for Riley Ridge CO2 supplies. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br /> <br />6.1 SEPTEMBER EVENTS <br /> <br />Comments were received on the Corridor Study and were forwarded <br />to BlM Division of EIS Services, for incorporation into <br />the report. <br /> <br />Division of EIS Services personnel accompanied Stefanec <br />to meetings with offieials from the City of North Las Vegas, <br />Clark County, Nellis Air Force Base, and the National Park <br />Service to gather additional data on available alignments <br />through the Las Vegas area (see Section 7.0). <br /> <br />Forest Service/Reclamation Memorandum of Understanding submitted <br />to the Forest Service for formal review. <br /> <br />8lM Division of EIS Services submitted FY84 budget estimates <br />to Reclamation for completion of Corridor Study and work <br />on EIS. <br /> <br />Effort continued on Work Order #2 to BlM/Reclamation Interagency <br />Agreement which will define work to be done by the Oivision <br />of EIS Services on the AQUATRAIN EIS. <br /> <br />Work continues on the internal Preliminary Report which <br />will provide an appraisal-level analysis of project designs, <br />costs, construction schedules and financing options. <br /> <br />McKeever and Dean presented talks and participated in discussions <br />on "Environmental Mediation" for a meeting of the Rocky <br />Mountain Association of Environmental Professionals in Salt <br />lake City. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.