My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12248
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:23 PM
Creation date
10/12/2006 5:28:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1983
Title
Monthly Progress Report - Aquatrain Project - September 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r- <br />~.J <br /> <br />. <br /> <br />. <br /> <br />fI:'~ <br />~~ <br />( ..-, <br />c..) <br /> <br />City of North Las Vegas: Project briefing met with interest <br />and responsiveness from City officials. Various alignment <br />possibilities discussed. No major concerns expressed <br />about Project. <br /> <br />Lake Mead National Recreation Area: A possible routing <br />along the north shore road was visited and discussed. <br />Park Service supportive but expressed the view that routes <br />outside the recreation area would be considered preferable <br />to those inside the area. <br /> <br />City of Henderson: Continued productive exchange with <br />City Manager. Will work together to schedule Project <br />briefing for all Henderson elected officials. <br /> <br />8riefed County Commissioners from Juab, Emery, and Sanpete <br />Counties on AQUATRAIN Project. Advance work in Utah will <br />be coordinated through the Executive Directors of the Southeast <br />Utah Association of Local Governments, and the Six County <br />Association of Governments. <br /> <br />Met with USBR Washington, Engineering and Research Center, <br />and Upper Colorado Region planning personnel to discuss <br />the Plan Formulation Working Document. Internal Reclamation <br />coordination procedures agreed to for moving toward an acceptable <br />draft document. <br /> <br />Wyoming advance work completed this month. Met with officials <br />of the following entities: Cities of Rock Springs, Green <br />River, Evanston, Kemmerer, and Pinedale; and Sweetwater, <br />Lincoln, Uinta, and Sublette Counties. Very productive <br />exchange in all meetings. Should AQUATRAIN in fact secure <br />its CO supplies from the Riley Ridge Project, AQUATRAIN <br />impact~ would be minimized given the planned development <br />by Riley Ridge which is assessed in the draft EIS now out <br />for review. Wyoming officials met during this trip were <br />supportive of the Riley Ridge Project and AQUATRAIN. Some <br />inaccurate information is circulating on salinity function <br />of AQUATRAIN in Wyoming. This will be attended to in the <br />near future. Followup meetings to be coordinated with contacts <br />made during the trip. <br /> <br />7.2 ANTICIPATED OCTOBER EVENTS <br /> <br />Project briefing to City of North Las Vegas elected officials <br />on October 19. <br /> <br />Project briefings to Henderson Chamber of Commerce and Nellis <br />Air Force Base officials on October 20. <br /> <br />Utah advance work. <br /> <br />Coordinate with Upper Colorado Region to solidify scheduled <br />flag dates for reports. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.