Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />12e. Geologic Considerations <br /> <br />The Contractor will utilize the geologic data and geologic <br /> <br /> <br />evaluations developed in Phase I of the study for the phase II <br /> <br /> <br />geologic evaluation. Additional investigations of a very limited <br /> <br /> <br />nature may be performed if, in the opinion of the Contractor or <br /> <br /> <br />the State, more information is required at one or more of the <br /> <br /> <br />four potential reservoir sites to develop reconnaissance-level <br /> <br /> <br />cost estimates. The Phase II geologic analyses will concentrate <br /> <br /> <br />on identification of any major potential problems associated with <br /> <br /> <br />construct ion of major project features. <br /> <br />12f. Investment Cost Analysis <br /> <br />The Contractor will estimate the total capital cost of each <br />alternative (as formulated to include all applicable project <br />purposes) to include items 1 through 8 of activity 12b. This <br />capital cost estimate will be displayed in an itemized manner in <br />the draft final report without escalation of costs for staged <br />construction and without interest during construction. All costs <br />will be expressed in 1982 dollars. Using this cost estimate as a <br />base, the contractor will estimate total investment costs for <br />each alternative using the two following approaches: <br /> <br />-5- <br />