My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12087
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:49 PM
Creation date
10/12/2006 5:23:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
10/27/1982
Title
Task 12 -Evaluate Selected Alternatives
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />1. State Funding Approach-~This approach assumes that a <br /> <br /> <br />Cache la poudre proiect would be authorized and funded <br /> <br /> <br />by the Colorado General Asembly through the Colorado <br /> <br /> <br />Water Conservation Board construction fund. Costs for <br /> <br /> <br />short term financing will not be included. <br /> <br />The Contractor shall assume a reasonable <br />schedule of pre-construction and construction <br />activities beginning with the initiation of planning <br />and feasibility studies in mid-1983 and terminating <br />with the on-line date of the project. Expenditures for <br />all activities will be staged and escalated for <br />inflation at a rate of eight percent per year <br />throughout the planning and construction period. <br /> <br />The annual amortization requirement will be calculated <br /> <br /> <br />assuming interest computed on the total of all capital <br /> <br /> <br />expenditures at an annual rate of five per cent over a <br /> <br /> <br />period of forty years. The contractor will display and <br /> <br /> <br />discuss, in the draft final report, the staged, <br /> <br /> <br />escalated schedule of expenditures, the annual <br /> <br /> <br />amortization r.equir.ement, and the annual cost of. <br /> <br /> <br />operations and maintenance as well as an average annual <br /> <br /> <br />cost for replacement computed as of the on-line date of. <br /> <br /> <br />a project. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.