Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />2. Costs of land acquisition, including all minor <br />structures and facilities which must be acquired or <br />relocated. <br /> <br />3. Costs of relocating all major facilities and <br />structures, including highways and the State fish <br />hatchery which is presently located above Idylwilde. <br />Relocation costs for major facilities and structures <br />will be itemized separately in all cost estimates. <br /> <br />4. Costs of providing access to any U. S. Forest <br />Service facilities which would be impacted by <br />implementation of an alternative. <br /> <br />5. All costs associated with engineering design, <br />preparation of plans and specifications, <br />surveying, geologic studies and construction <br />administration and supervision. <br /> <br />6. All administrative and legal costs associated with <br />project implementation. <br /> <br />7. Costs of planning studies, feasibility studies, <br /> <br /> <br />environmental studies and of any activities associated <br /> <br /> <br />with permit requirements. <br /> <br /> <br />8. Appropriate contingencies for reconnaissance-level <br /> <br /> <br />costs estimates. <br /> <br />-3- <br />