Laserfiche WebLink
<br />CJ <br />o <br />(....., <br />~ <br />~ <br />'^') <br /> <br />TABLE <br /> <br />2.1 <br /> <br />3.1 <br />3.2 <br /> <br />3.3 <br /> <br />3.4 <br /> <br />3.5 <br /> <br />4.1 <br />4.2 <br />4.3 <br />4.4 <br /> <br />4.5 <br /> <br />4.6 <br />4.7 <br /> <br />5.1 <br />5.2 <br /> <br />6.1 <br /> <br />7.1 <br /> <br />7.2 <br /> <br />7.3 <br /> <br />8.1 <br /> <br />8.2 <br /> <br />8.3 <br /> <br />LIST OF TABLES <br /> <br />Reservoir Sites and Capacities Selected for Reconnaissance <br />Investigation <br /> <br />Average Annual Transmountain Diversion Demands (1000 af/yr) <br />Estimated Irrigation Diversions for Major Water Rights Upper <br />Colorado River Basin (1951-1983 Average Annual) <br />Estimated Annual In-Basin Municipal Demands Upper Colorado <br />River Basin <br />Projects/Facilities included in Moderate and High-Future-Level <br />Use Scenarios <br />Demand by Category of Use for Development Scenarios <br /> <br />Existing Reservoirs <br />Instream Flow Requirements <br />Water Rights Summary for Project Reservoirs <br />Comparison Between Average Annual Recorded and Simulated <br />Flows (1973-1983) <br />Green Mountain Reservoir Estimated Annual Release Requirement <br />for CBT Replacement and In-Basin Uses (Water Years 1951-1983) <br />Green Mountain Exchange Project Average Annual Yield (1000 af/yr) <br />Estimated Reservoir Firm Annual Yield Under Various Scenarios <br />(1000 af/yr) <br /> <br />Wolford Mountain Site A' Summary of Estimated Annual Operation Costs <br />Wolford Mountain Site A' Dam and Reservoir Summary of Estimated <br />Construction Quantities and Costs <br /> <br />Wolford Mountain Site C Dam and Reservoir Summary of Estimated <br />Construction Quantities and Costs <br /> <br />Red Mountain Dam and Reservoir Summary of Estimated Construction <br />Quantities and Costs <br />Hydropower Addition at Red Mountain Dam Summary of Estimated <br />Construction Quantities and Costs <br />Red Mountain Dam and Reservoir Summary of Estimated Annual <br />Operation Costs <br /> <br />Azure Dam and Reservoir Summary of Estimated Construction <br />Quantities and Costs <br />Hydropower Addition at Azure Dam and Reservoir Summary of Estimated <br />Construction Quantities and Costs <br />Azure Pam and Reservoir Summary of Estimated Annual Operation Costs <br /> <br />iv <br /> <br />L <br /> <br />PAGE <br /> <br />2-6 <br /> <br />3-7 <br /> <br />3-9 <br /> <br />3-10 <br /> <br />3-13 <br />3-14 <br /> <br />4.3 <br />4-6 <br />4.7 <br /> <br />4-8 <br /> <br />4-11 <br />4-13 <br /> <br />4-17 <br /> <br />5-9 <br /> <br />5-10 <br /> <br />6-9 <br /> <br />7-8 <br /> <br />7-9 <br /> <br />7-9 <br /> <br />8.9 <br /> <br />8-10 <br />8-11 <br />