My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12030
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:39 PM
Creation date
10/12/2006 5:21:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Final Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />1 C) <br />o <br />-:1 ('""' <br />C) <br />~ <br />'I".) <br /> <br />I <br /> <br />.\ <br />J <br /> <br />.'1 <br />. <br />., <br />.! <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />11.0 <br /> <br />GREEN MOUNTAIN RESERVOIR TO DILLON RESERVOIR CONVEYANCE <br />SYSTEM <br />11.1 L.OCATION <br />11.2 FLOW CAPACITY <br />11.3 ROUTE AND GEOTECHNICAL CONSIDERATIONS <br />11.4 PUMP STATIONS <br />11.5 PIPELINE <br />11.6 CONVEYANCE SYSTEM OPERATION <br />11.7 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS <br /> <br />12.0 <br /> <br />HYDROPOWER EVALUATION <br />12.1 PROJECT IMPACT ON GREEN MOUNTAIN HYDROPOWER <br />12.2 HYDROPOWER POTENTIAL OF PROJECT RESERVOIRS <br /> <br />13.0 ALTERNATIVE COMPARISONS <br />13.1 JOINT-USE RESERVOIRS <br />13.2 REPLACEMENT CAPABILITY OF THE PROJECT RESERVOIRS <br />13.3 CAPITAL AND TOTAL INVESTMENT COSTS <br />13.4 YEARLY DEBT SERVICE AND OPERATING COSTS <br />13.5 COST AND YIELD COMPARISONS <br />13.6 PROJECT DEVELOPMENT <br /> <br />14.0 REFERENCES <br /> <br />APPENDIXES (Under Separate Cover) <br />A. HYDROLOGIC ANALYSIS <br />B. PRELIMINARY DAM DESIGN, RESERVOIR AND CONVEYANCE SYSTEM <br />C. SUMMARY OF GEOTECHNICAL EXPLORATION <br /> <br />Hi <br /> <br />PAGE <br /> <br />11-1 <br />11-1 <br />11-1 <br />11-1 <br />11-2 <br />11-6 <br />11-9 <br />11-13 <br /> <br />12-1 <br />12-1 <br />12-2 <br /> <br />13-1 <br />13-1 <br />13-2 <br />13-6 <br />13-6 <br />13-6 <br />13-10 <br /> <br />14-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.