Laserfiche WebLink
<br />0 <br />0 TABLE OF CONTENTS (continued) <br />" PAGE <br />0) <br />~ 6.0 WOLFORD MOUNTAIN SITE C DAM AND RESERVOIR 6-1 <br />'"'"" 6.1 SITE TOPOGRAPHY 6-1 <br /> 6.2 STUDIES AND FIELD INVESTIGATIONS 6-1 <br /> 6.3 GEOLOGICAL DESCRIPTION 6-2 <br /> 6.4 DESIGN CONSIDERATIONS 6-3 <br /> 6.5 PROPOSED DAM AND APPURTENANCES 6-6 <br /> 6.6 HIGHWAY RELOCATION 6-8 <br /> 6.7 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS 6.8 <br /> 7.0 RED MOUNTAIN DAM AND RESERVOIR 7-1 <br /> 7.1 SITE TOPOGRAPHY 7-1 <br /> 7.2 STUDIES AND FIELD INVESTIGATIONS 7-1 <br /> 7.3 GEOLOGICAL DESCRIPTION 7-2 <br /> 7.4 DESIGN CONSIDERATIONS 7-2 <br /> 7.5 PROPOSED DAM AND APPURTENANCES 7-5 <br /> 7.6 RELOCATIONS 7-6 <br /> 7.7 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS 7-7 <br /> 8.0 AZURE DAM AND RESERVOIR 8-1 <br /> 8.1 SITE TOPOGRAPHY 8-1 <br /> 8.2 STUDIES AND FIELD INVESTIGATIONS 8-1 <br /> 8.3 GEOLOGICAL DESCRIPTION 8-2 <br /> 8.4 DESIGN CONSIDERATIONS 8-3 <br /> 8.5 PROPOSED DAM AND SPILLWAY 8-5 <br /> 8.6 APPURTENANCES TO THE DAM 8-7 <br /> 8.7 RAILROAD RELOCATION 8-8 <br /> 8.8 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS 8-8 <br /> 9.0 WOLCOTT DAM AND RESERVOIR 9-1 <br /> 9.1 SITE TOPOGRApHY 9-1 <br /> 9.2 STUDIES AND FIELD INVESTIGATIONS 9-2 <br /> 9.3 GEOLOGICAL DESCRIPTION 9-2 <br /> 9.4 DESIGN CONSIDERATIONS 9-3 <br /> 9.5 PROPOSED DAM AND SPILLWAY 9-5 <br /> 9.6 RIVER DIVERSION PUMPING SYSTEM 9-8 <br /> 9.7 HIGHWAY RELOCATION 9-9 <br /> 9.8 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS 9-9 <br /> 10.0 UNA DAM AND RESERVOIR 10-1 <br /> 10.1 SITE TOPOGRAPHY 10-1 <br /> 10.2 STUDIES AND FIELD INVESTIGATIONS 10-1 <br /> 10.3 GEOLOGICAL DESCRIPTION 10.2 <br /> 10.4 DESIGN CONSIDERATIONS 10-3 <br /> 10.5 PROPOSED DAM AND SPILLWAY 10-5 <br /> 10.6 APPURTENANCES TO THE DAM 1 0-7 <br /> 10.7 RELOCATIONS 10-7 <br /> 10.8 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS 10-8 <br /> <br />ii <br />