My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12030
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:39 PM
Creation date
10/12/2006 5:21:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Final Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />] A <br />1 c) <br />0 <br /> (~ LIST OF TABLES (continued) <br />l 0) <br />w:::. TABLE PAGE <br />J ~~ <br /> 9.1 High Wolcott Dam and Reservoir Summary of Estimated Construction <br />"J Quantities and Costs 9-11 <br /> 9.2 Low Wolcott Dam and Reservoir Summary of Estimated Construction <br /> Quantities and Costs 9-12 <br />] 9.3 High Wolcott Dam and Reservoir Summary of Estimated Annual <br /> Operation Costs 9-13 <br /> .9.4 Low Wolcott Dam and Reservoir Summary of Estimated Annual <br />l Operation Costs 9-13 <br /> 10.1 Una Dam and Reservoir Summary of Estimated Construction Quantities <br /> and Costs 10-9 <br />-I 10.2 Hydropower Addition at Una Dam and Reservoir Summary of Estimated <br />oj Construction Quantities and Costs 10-10 <br /> 10.3 Una Dam and Reservoir Summary of Estimated Annual Operation Costs 10-11 <br />J 11.1 Estimated Sizes of Surge Control Devices 11-8 <br /> 11.2 Range of Conveyance System Flows in AF Per Year To Meet Average <br /> Supplemental Water Requirement of Dllion Reservoir 11-.10 <br />] 11.3 Estimated Blliable Energy Demand and Average Energy Consumption 11-11 <br /> 11.4 8000 af Conveyance System Summary of Estimated Construction <br /> Quantities and Costs 11-105 <br /> 11.5 12,000 af Conveyance System Summary of Estimated Construction <br /> Quantities and Costs 11-16 <br /> 11.6 Hydropower Retrofit at Green Mountain Dam Summary of Estimated <br /> Construction Quantities and Costs 11-17 <br /> 11.7 8000 af Conveyance System Summary of Estimated Annual Operation <br /> Costs 11-18 <br /> 11.8 12,000 af Conveyance System Summary of Estimated Annual Operation <br /> Costs 11-18 <br /> 12.1 Summary of Estimated Hydropower Plant Costs 12-4 <br /> 12.2 Projected Hydropower Generation and Estimated Production Cost 12-4 <br /> 13.1 Joint-Use Reservoir Alternatives 13-1 <br /> 13.2 Replacement Reservoir Alternatives for Green Mountain <br /> Exchange Project 13-2 <br /> 13.3 Gr,een Mountain Exchange Project Yield with Alternative <br /> Replacement Reservoir(s) 13-3 <br /> 13.4 Summary of Estimated Investment Costs 13-5 <br />J 13.5 Summary of Yearly Debt Service and Average Annual Operating Costs 13-7 <br /> 13.6 Estimated Cost of Joint-Use Reservoir Yield 13-8 <br /> 13.7 Estimated Cost of Replacement Reservoir Yield 13-9 <br /> 13.8 Estimated Cost of Conveyance System Water Transfer 13-11 <br /> 13.9 Cost of Exchange Project Water Available to Roberts Tunnel 13.12 <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.