Laserfiche WebLink
<br />SECTION C <br />PROPOSAL REQUIREMENTS <br /> <br />Each proposal shall include a detailed overview of the proposed saline <br />spring collection system, desalination facility, co-facilities, <br />salt/brine disposal plan, powerlines, pipelines, fuel source., and site <br />locations. <br /> <br />Each proposal will address the evaluation criteria, a. listed in <br />Section E, specifically and in the order shown. Reference materials, <br />supporting materials, and documentation are to be clearly identified by <br />attachment number and appended to the back of the proposal. <br /> <br />C~ <br />