My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11964
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:27 PM
Creation date
10/12/2006 5:19:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee AWRBIAC
Basin
Arkansas
Water Division
2
Date
1/1/1951
Title
Arkansas White Red Basins Inter Agency Committee Procedure Guide First Edition
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />,. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />o <br />(::') <br />~ <br />~ <br />,. ) <br />en <br /> <br />1 January 19: 1 <br /> <br />AWRBIAC PROCEDURE GUIDE <br />TV. ASSIGNl4ENT OF WORK (Cont' d) <br /> <br />HYdroelectric Power <br /> <br />a. Statement: The inveetigation of this eubJect will be made <br />basically in two parts, i.e., development and utilization. <br /> <br />Major steps in the studies are: <br /> <br />(1) ~ Develo:Plllent: <br /> <br />(a) Investigate each basin for dam and reservoir sites <br />for multiple purpose or power alone, taking into account the availabil- <br />ity of water for the purpose. <br /> <br />(b) Make preliminary plana for developing each baein and <br />rough estimates of cost for optimum development of the hydroelectric <br />potentialities cons1etent with the other uses of water, <br /> <br />(c) Make final plana for the entire system so as to <br />prod.uce the optimum dependable power. <br /> <br />(d) Review coet and benefits of each project and deter- <br />mine the economy of the entire eystem. <br /> <br />(2) Power Utilization: <br /> <br />(a) Determine the present needs and estimate the future <br />needs for power, <br /> <br />(b) Determine the present and future values of hydro- <br />electric power. <br /> <br />b. Subject Coordinating Agency: Federal Power Canm.ission <br /> <br />" c. Assisting Agencies: States; Interior (BR, SPA); Corps of <br />Engineers; Agriculture; and Federal Security Agency (PES). <br /> <br />n <br /> <br />d. Time of Completion: <br /> <br />e. Disposition: To be prepared as a section of the final report <br />to Congress <br /> <br />. !V-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.