Laserfiche WebLink
<br />.OO2.?Q <br />2. <br /> <br />3. <br /> <br />J <br />J <br /> <br />2 <br /> <br />Foothills Tunnel andCond. No. 26 - <br />Type -- pressure, concrete and steel lined <br />Length - 18,000 rt. <br />Diameter - 10'6" <br />Capacity - 1160 cubic ft./second (750 mgd) <br />Condo No. 26 - 1700 ft. -- 10'6" diam. - steel <br /> <br />Treatment Plant - <br />Type -- rapid mechanical <br />Capacity - 125 million gallons per day - 1st unit <br />500 million gallons per day - ultimate <br />(incremental additions) <br /> <br />Structures - <br />Headworks - <br />- Control of inflow to' treatment plant <br />- Hydro~ power generation <br />Chemical Building - <br />- Chemical storage <br />- Chemical feeds <br />- Chemical mixing <br />- Inflow metering <br />- Electrical power center <br />- Plant pu.mping <br />Flocculation and Sedimentation Basin - 125 mgd <br />- Flocculation equipment <br />- Continuous sludge removal <br />Filter BUilding <br />-.a dual media filter units - 125 mgd <br />- Settled water, wash water, effluent water piping and <br />valves <br />Clear Water Storage - <br />- Two underground concrete reservoirs <br />- Capacity - 25 million gallons each <br />Chlorine and Ammonia Storage Bldg. <br />- Chlorine storage <br />- tank trailers <br />- 1 ton cylinders <br />Steel tanks aqua ammonia storage <br />Control Building - <br />Plant offices <br />- Visitors center <br />- Plant control <br />- Computer <br />- Laboratory <br />- Operating personnel facilities <br />Waste Disposal Facilities - <br />- Washwater recovery basins and pu~ps <br />- Overflow holding pond <br />- Sludge pu.mping <br />- Sludge drying bas ins <br />- 15 acres on site <br />- Sludge disposal <br />- Land fill - limestone pits in Vicinity <br /> <br />a <br /> <br />.1 <br />