Laserfiche WebLink
<br />3 <br /> <br />00276 <br /> <br />Aurora Raw Water Interconnection <br /> <br />- 4000 ft. - 60-inch and 54-inch conduit, valving and ~etering I <br /> <br />5. Access Roads - <br /> <br />- County roads to treatment plant <br />- Platte Canyon Road to dam and tunnel (imrr0V~~~~~5) <br />- New road to right abutment of dam <br /> <br />6. Conduit No. 27 <br /> <br />- 53.000 ft. - 108" diam. to Highlands Reservoir <br />- 39.000 ft. - 90" diam. Highlands Reservoir to Hillcrest <br />Reservoir <br /> <br />The estimated cost of the 1st 125 mgd increment of the Foothills <br />Project is as follows: <br /> <br />1. Strontia Springs Dam and Reservoir $ 19,493,000 <br />2 . Foothills Tunnel and Conduit No. 26 16,631,000 <br />3. Foothills Treatment Plant 44;165,000 <br />4. Aurora Raw Water Interconnection 821,900 <br />5. Access Roads 2,166,000 <br />6 . Conduit No. 27 36,501,000 <br />7. Services during Construction and <br /> Inspection 8,859,000 <br /> TOTAL :;; ~28,636,900 <br /> <br />Note: This does not include $6,200,000 which has been spent <br />on the project as ?f December 31, 1977. <br />