My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11761
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:46 PM
Creation date
10/12/2006 5:09:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Summary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />(-:"" <br />en <br />t<) <br />C> <br /> <br />TABLE S.7 <br /> <br />JOINT-USE RESERVOIR ALTERNATIVES AND <br />COMPARATIVE UNIT COST OF YIELD <br /> <br /> FIRM 1) TOTAL 2) UNIT 3) <br /> RESERVOIR ANNUAL COST COST OF <br />JOINT-USE CAPACITY YIELD PER YEAR YIELD <br />RESERVOIR (af) (af/yr) ($1,000,000) ($/af) <br />Wolford Mountain A' ) 120,000 40,000 7.1 $180 <br />w/Colo. diversion 4 120,000 49,000 10.4 210 <br />Wolford Mountain C 60,000 25,000 3.9 160 <br />Red Mountain 140,000 56,000 14.2 250 <br />Azu re 85,000 48,000 12.3 260 <br /> <br />1) Firm annual yield is defined as the quantity of water that can be supplied every year without <br />shortage during the study period of 1951 through 1983. Demands on the Joint-Use <br />Reservoirs are based on a high future-level of water development, without pumpback to <br />Dillon Reservoir from Green Mountain Reservoir. <br /> <br />2) <br /> <br />Total cost per year is the sum of yearly debt service, average. electrical power and other <br />operating costs from Table S.6. <br /> <br />3) <br /> <br />I <br />, <br />',:"1 <br /> <br />Estimated cost per acre-foot of firm reservoir yield during a year of average operating costs. <br /> <br />4) Wolford Mountain A' would either store only the flows of Muddy Creek, or alternatively, <br />supplement Muddy Creek storage with flows diverted and pumped from the Colorado River. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.