Laserfiche WebLink
<br />'" <br />;',"j <br /> <br />:--.0 <br />,( .--. <br />:>:", '1........ <br />o <br />'" c-, <br />fen <br />) t-,.. <br /><.0 <br /> <br />TABLE S.6 <br /> <br />SUMMARY OF YEARLY DEBT SERVICE AND <br />AVERAGE ANNUAL OPERATING COSTS <br />($1,000,000) <br /> <br /> DEBT 1) POWER OTHER 2) TOTAL COST 3) <br /> FEATURE SERVICE COST COSTS PER YEAR <br /> CAPACITY <br /> RESERVOIR (afl <br /> Wolford Mountain A' 120,000 $ 7.0 $ 0.1 $ 7.1 <br /> w/Colo. diversion 4) 120,000 9.8 $0.4 0.2 10.4 <br /> Wolford Mountain C 60,000 3.8 0.1 3.9 <br />-, ~ Red Mountain 140,000 14.0 0.2 14.2 <br />: <{ Azure 85,000 12.2 0.1 12.3 <br />c,'- <br /> Wolcott w/diverslon from: 4) <br /> Eagle & Colo. 350,000 54.6 10.8 0.7 66.1 <br /> Eagle only 160,000 22.4 3.7 0.4 26.5 <br /> Una 150,000 25.8 0.2 26.0 <br /> CONVEYANCE FLOW RATE 5) <br /> SYSTEM (af/vr) <br /> 12,000 af/mo. 119,000 $17.6 $9.86) $ 0.8 $28.2 <br /> 113,000 17.6 9.3 6) 0.8 27.7 <br /> 8,000 af/mo. 87,000 14.7 7.16) 0.7 22.5 <br /> 81,000 14.7 6.6 6) 0.7 22.0 <br /> <br />1) <br /> <br />Annual principal and interest payment on 30-year, 8 percent financing In the amount of the <br />total Investment cost. Construction costs are Indexed to January, 1986. <br /> <br />2) <br />3) <br /> <br />Other costs include operating and maintenance labor, supplies and repair costs. <br /> <br />Total cost per year is the sum of yearly debt service, average electrical power and other <br />operating costs. <br /> <br />4) <br />5) <br />6) <br /> <br />Diversion Involves pumping from Colorado R. or Eagle R. or both rivers, as cited. <br /> <br />, Flow rates shown match Average Conveyance System Flow of Table S,8. <br /> <br />Compensation of $340,000 per year for lost revenue from Green Mountain hydropower <br />included in average annual power costs for the conveyance system. <br /> <br />19 <br />