My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11761
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:46 PM
Creation date
10/12/2006 5:09:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Summary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c..J <br />o <br />r' <br />en <br />1-" <br />QO <br /> <br />:i <br /> <br />GREEN MOUNTAIN EXCHANGE PROJECT: For Replacement Reservoir alternatives, <br />analyses were made of Wolcott Reservoir and combinations of reservoirs including Wolcott and Red <br />Mountain, Wolcott and Azure, Red Mountain and Una, and Wolford Mountain A' and Una Reservoirs. <br />The Green Mountain Exchange Project is Illustrated on Figure S.3 at the end of this report. <br /> <br />Two of the reservoir combinations, Red Mountain with Una, and Wolford Mountain A' with <br /> <br />Una, are shown on Table S.1 as being capable of fully replacing the 144,000 af yield of Green <br /> <br /> <br />Mountain Reservoir. Other reservoirs and reservoir combinations would only partially replace Green <br /> <br />Mountain Reservoir. In these cases, a portion of the capacity of Green Mountain Reservoir would <br /> <br /> <br />continue to serve its original function. <br /> <br />In order to compare alternatives in this study, it was assumed that the yield of the <br /> <br />Replacement Reservoir(s) could be exchanged for an equal quantity of yield from Green Mountain <br /> <br />Reservoir. The actual quantities of exchange may differ from this Study depending upon the <br /> <br />institutional arrangements between the interested parties. <br /> <br />,-,' <br /> <br />TABLE S.5 <br /> <br />CONVEYANCE SYSTEM <br />SUMMARY OF ESTIMATED INVESTMENT COSTS <br />($1,000,000) <br /> <br /><] <br /> <br />ITEM <br /> <br />8,000 <br />af/mo <br /> <br />12,000 <br />af/mo <br /> <br />Land Acquisition <br />Pipeline <br />Reservoirs <br />Pump Stations <br />Surge Control <br />Subtotal of Direct Costs <br />Contingencies (25%) <br />TOTAL DIRECT COST <br />Engineering, Legal, Administration (20%) <br />TOTAL CONSTRUCTION COST <br />Interest During Construction (4 yrs.) <br />TOTAL CAPITAL COSTS <br />Financing & Reserve <br />TOTAL INVESTMENT COST <br /> <br />$ 0.8 <br />62.7 <br />0.9 <br />15.3 <br />2.9 <br />$ 82.6 <br />20.7 <br />$103.3 <br />20.7 <br />$ 124.0 <br />20.0 <br />$144.0 <br />21,5 <br />$165.5 <br /> <br />$ 0.8 <br />77.0 <br />1.1 <br />16.6 <br />3.1 <br />$ 98.6 <br />24.7 <br />$ 123.3 <br />24.7 <br />$148.0 <br />24.0 <br />$ 172.0 <br />26,0 <br />$ 198.0 <br /> <br />,. <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.