Laserfiche WebLink
<br />,.,\ <br />:<1 <br />," <br /> <br />o <br />l~ <br />c.n <br />':J f\';'1 <br />..j l-' <br /> <br />',,) <br /> <br />, <br />,:) <br />" <br />~J <br /> <br />:: ':~ <br />,::'j <br />,< :~ <br /> <br />~)~ <br /> <br />'.1 <br />t.jI <br /> <br />tl <br /> <br />:.~~ <br />":':1 <br />U <br /> <br />t:~ <br />v:! <br />:.,;;,< <br /> <br />rl <br />LJ <br /> <br />:" <br />i::'J <br /> <br />'-'\ <br /> <br />"';, '~ <br />;: ~ <br />"j <br /> <br />Both the conveyance system cost and the costs of selected Replacement Reservoirs must be <br />combined to indicate the total cost of additional water made available at Dillon Reservoir. This is <br />presented in Table 5.8. The Exchange Project Yield is the increased average annual yield to the <br />Roberts Tunnel Collection System which results from operation of the pumpback with the <br />Conveyance System and the Replacement Reservoir(s). <br /> <br />TABLE 5.8 <br /> <br />COST OF EXCHANGE PROJECT WATER <br />AVAILABLE TO ROBERTS TUNNEL <br /> <br />REPLACEMENT 1) <br />RESERVOIR(S) <br /> <br />AVERAGE 2) <br />CONVEYANCE <br />SYSTEM FLOW <br />(1000 af/yr) <br /> <br />TOTAL 3) <br />COST <br />PER YEAR <br />($1,000,000) <br /> <br />UNIT 4) <br />COST OF <br />WATER <br />($/af) <br /> <br />EXCHANGE <br />PROJECT <br />YIELD <br />(1000 af/yr) <br /> <br />Wolcott w/diversion from <br />Eagle & Colo. 113 119 $93.8 $790 <br />Red Mountain & Una 119 124 68.4 550 <br />Una & Wolford Mountain A' 119 124 64.7 520 <br />w/Colo. diversion <br />Azure & Wolcott 87 ,101 61.4 610 <br />w/Eagle diversion <br />Red Mountain & Wolcott 81 93 62.7 670 <br />wlEagle diversion <br /> <br />1) <br />2) <br /> <br />Diversion Involves pumping from Colorado R. or Eagle R. or both rivers, as cited. <br /> <br />The 8000 aflmo conveyance system was combined with the Azure-Wolcott and Red <br />Mountain-Wolcott replacement reservoirs. The 12,000 af/mo system was combined with the <br />Wolcott/Eagle-Colo., Red Mountain-Una and Wolford A'-Una replacement reservoirs, <br /> <br />3) <br /> <br />Total cost per year is the sum of yearly debt service and operating costs from Table 5.6 for <br />the listed reservoir(s) and the corresponding conveyance system. Construction costs are <br />Indexed to January" 1986. <br /> <br />4) <br /> <br />Estimated cost per acre-foot of project water delivered in a year of average operating costs. <br /> <br />21 <br />