My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11749
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:43 PM
Creation date
10/12/2006 5:09:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
8/30/1967
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IHHJ7fH . <br /> <br />. <br /> <br />land and 6,340 acres of new land, develop 3,000 acre-feet of municipal <br /> <br />and industrial water, and provide benefits to recreation and fish and <br /> <br />wildlife. Owens and Buzzard Creek Reservoirs would be constructed on <br /> <br />Buzzard Creek to regulate and store its excess flows for project use. <br /> <br />The irrigation supplies would be distributed through a group of project <br /> <br />facilities, including the Harrison, Brush Creek, and Colorado Canals, the <br /> <br />Cheney Lateral, and a series of smaller laterals branching from the main <br /> <br />canals. Municipal .and industrial water would be made available for sale <br /> <br />at the outlet works of Buzzard Creek Reservoir. Recreation facilities <br /> <br />would be installed at both reservoirs. <br /> <br />Agricultural economy studies, geologic investigations, construction mate- <br /> <br />rials surveys, and preparation of design data for the Bluestone Project <br /> <br />are continuing. Preparation of the project lands appendix is nearing <br /> <br />completion. A proposed feasibility report is scheduled for completion <br /> <br />at the end of FY 1968. <br /> <br />Plan formulation studies, water supply studies, geologic investigations, <br />and construction materials surveys on the Grand Mesa project~are continuing. <br /> <br />A proposed feasibility report is scheduled to be completed in FY 1969. <br /> <br />On the Upper Gunnison Project, plan formulation studies, engineering <br /> <br />surveys, and collection of basic water supply data are in progress. A <br /> <br />proposed feasibility report is scheduled for completion in FY 1971. <br /> <br />Feasibility designs and estimates have been completed for some features <br /> <br />of the Yellow Jacket Project. These include the Yellow Jacket Canal and <br /> <br />Diversion Dam, Thornburgh Dam, and Ripple Dam. Designs and estimates on <br /> <br /> <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.