Laserfiche WebLink
<br />{} fHl nr. <br /> <br />. <br /> <br />all remaining project features are nearing completion. Preparation of <br /> <br /> <br />the financial and economic ana~sis will be undertaken as soon as the <br /> <br /> <br />cost estimates have been completed. Writing of several chapters of the <br /> <br /> <br />proposed feasibility report is in progress. <br /> <br />It now appears that the proposed feasibility report for the Yellow Jacket <br />Project, scheduled for completion this fall, will be delayed until the <br />end of 1967 because of anticipated late receipt of cooperative reports <br />from other Federal agencies. <br /> <br />FUnds contributed by the Basalt Water Conservancy District enabled us to <br /> <br />initiate land classification and drainage field work on the Basalt Project <br /> <br /> <br />during the latter part of FY 1967. This work is continuing. <br /> <br />ADVANCE PLANNING <br />The Fruitland Mesa Project definite plan report draft is in the final <br />stages of review and ana~sis. The plan of development was reported on <br />at our last meeting. Preconstruction activities will continue during the <br />remainder of this fiscal year. <br /> <br />On the Savery-Pot Hook Project, engineering field surveys, tabulation and <br />ana~sis of land classification and drainage field data, water supp~ <br />studies, and geologic investigations are in progress. Studies are being <br /> <br /> <br />made to see if additional lands could be included to replace lands in the <br /> <br />Fourmile and Timberlake areas that were determined to be nonirrigable. <br /> <br />SMALL RECLAMATION PROJECTS <br /> <br /> <br />Engineers for the Yamcola Reservoir Company, Yampa, Colorado, and the <br /> <br />Overland Reservoir Company, Hotchkiss, COlorado, are preparing loan <br /> <br />applications for their respective proposals. <br /> <br />10 <br /> <br />