Laserfiche WebLink
<br />Cost allocations-Major features-Lower Colorado River Basin project <br />[In thousands of dollars] <br /> <br /> I. Municipal Fishsnd Flood <br /> Power Irrigation snd Recreation ARA wildlife control Total <br /> industrial . <br />Bri~e Canyon (including_Coconino)__________________________ I 467,357 0 0 6,173 8,016 29.446 0 1 510,992 <br />Marble Canyon (including Paria)___________n_________________ 222,539 0 0 4,342 3,223 8,383 0 2 238,488 <br />Central Arizona.. ______________________________________________ 0 300, 882 167,631 5,942 2,974 1,9,194 8,706 3 505,329 <br /> Subtotal, title L_________________________________________ 689,896 300,882 167,631 16,457 i4,213 57,024 8,706 1, 254, 809 <br />Southern Nevada, title 1L___________________________.:_________ 0 0 81,003 0 0 0 0 481,003 <br />. Total, titles I a.nd 11.____________________________________ 689,896 300,882 248, 634 I 16,457 14,213 57,024 8, 706 1,335,812 <br /> <br />, <br /> <br />1 Excludes $334,000 from the nonreimbursable Colorado River Development Fund, <br />contribution,. and a.djustments. . . <br />2 Excludes $116,000 of contributions, transfers, and credits. <br />3 Excludes $1,500,000 of nonreimbursable Colorado River Development Funds and <br />contributions. <br /> <br />'As indicated on p. 1,7 of the January 1964 report, enlarged system capacities were <br />under consideration with State and local agencies at" that time. This estimate reflects <br />the cost of the presently:adopted plan. <br /> <br /> <br />, -~- . <br /> <br />.. <br /> <br /> <br /> <br /> <br /> <br />'".~, <br /> <br />,~'. <br /> <br />'.'.:. <br /> <br />o <br />C) <br />r-" <br />CO <br />C) <br />c..:! <br />~ <br />1;;1 <br />t< <br />o <br />.:a <br />1;;1 <br />::0 <br />a <br />o <br />t< <br />o <br />::0 <br />:>- <br />I;;j <br />o <br />::0 <br />~ <br />::0 <br />b:I <br />:>- <br />UJ <br />Z <br /> <br />'ll <br />::0 <br />~ <br />~ <br /> <br />,... <br />eo <br /> <br />",.'-," <br /> <br />,," ~ .." <br />