<br />Cost allocations-Major features-Lower Colorado River Basin project
<br />[In thousands of dollars]
<br />
<br /> I. Municipal Fishsnd Flood
<br /> Power Irrigation snd Recreation ARA wildlife control Total
<br /> industrial .
<br />Bri~e Canyon (including_Coconino)__________________________ I 467,357 0 0 6,173 8,016 29.446 0 1 510,992
<br />Marble Canyon (including Paria)___________n_________________ 222,539 0 0 4,342 3,223 8,383 0 2 238,488
<br />Central Arizona.. ______________________________________________ 0 300, 882 167,631 5,942 2,974 1,9,194 8,706 3 505,329
<br /> Subtotal, title L_________________________________________ 689,896 300,882 167,631 16,457 i4,213 57,024 8,706 1, 254, 809
<br />Southern Nevada, title 1L___________________________.:_________ 0 0 81,003 0 0 0 0 481,003
<br />. Total, titles I a.nd 11.____________________________________ 689,896 300,882 248, 634 I 16,457 14,213 57,024 8, 706 1,335,812
<br />
<br />,
<br />
<br />1 Excludes $334,000 from the nonreimbursable Colorado River Development Fund,
<br />contribution,. and a.djustments. . .
<br />2 Excludes $116,000 of contributions, transfers, and credits.
<br />3 Excludes $1,500,000 of nonreimbursable Colorado River Development Funds and
<br />contributions.
<br />
<br />'As indicated on p. 1,7 of the January 1964 report, enlarged system capacities were
<br />under consideration with State and local agencies at" that time. This estimate reflects
<br />the cost of the presently:adopted plan.
<br />
<br />
<br />, -~- .
<br />
<br />..
<br />
<br />
<br />
<br />
<br />
<br />'".~,
<br />
<br />,~'.
<br />
<br />'.'.:.
<br />
<br />o
<br />C)
<br />r-"
<br />CO
<br />C)
<br />c..:!
<br />~
<br />1;;1
<br />t<
<br />o
<br />.:a
<br />1;;1
<br />::0
<br />a
<br />o
<br />t<
<br />o
<br />::0
<br />:>-
<br />I;;j
<br />o
<br />::0
<br />~
<br />::0
<br />b:I
<br />:>-
<br />UJ
<br />Z
<br />
<br />'ll
<br />::0
<br />~
<br />~
<br />
<br />,...
<br />eo
<br />
<br />",.'-,"
<br />
<br />,," ~ .."
<br />
|