<br /> "
<br /> -',.
<br />$499,366,000
<br /> .',;" '.
<br />227,895,000 /" .. ",;"
<br />11, 960, 000
<br />10, 759, 000
<br />749,980,000 /:
<br />506,829,000 ,;'
<br />I 2, 000, 000 ...
<br />(')
<br /> .(.
<br />6,415,000
<br />1,265,224,000
<br />81,003,000
<br />1,346,227,000
<br /> ,.
<br /> ;.;-
<br /> ','<"
<br />
<br />
<br />...
<br />
<br />18
<br />001802
<br />
<br />THE LOWER COLORADO RlVER BASIN PROJECT
<br />
<br />COSTS AND RELATED DATA
<br />
<br />The cost of works proposed for authorization in titles I and II
<br />of this bill, the allocation of such costs among the various purposes to
<br />be served, the benefit-cost ratios and data on repayment are tabulated
<br />below:
<br />
<br />
<br />Title I:
<br />Sec. 104(a). Main stream reservoir unit:
<br />Bridge Canyon project, including dam reservoir power-
<br />plant, transmission facilities, and appurtenant works_
<br />Marble Canyon ptoject, including dam reservoir, power-
<br />plant, transmission facilities, and appurtenant works_
<br />Coconino silt-detentionreservoir_____ _ ______ ___ ___ ___
<br />Paria silt-detention reservoir _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
<br />
<br />Costs
<br />
<br />Subtotal, mainstream reservoir unit________________
<br />See, 104(b), Central Arizona unit________________________
<br />See, 104(c); Water quality investigations_________________
<br />Sec. 104(d). Works to be authorized fill units of project_____
<br />See, 104(e) , Outdoor recreation, conservation of scenery, and
<br />natural historio and archeologioal objects and fish
<br />
<br />and wildIifen___ _ _____________ _____________n___
<br />
<br />Total cost of works authorized in seo. 104____________
<br />Title II: Southern Nevada water supply_____________________
<br />
<br />Total, titles 1 and IL________________________________
<br />I Estimated.
<br />I No cost until authorized.
<br />
|