Laserfiche WebLink
<br /> " <br /> -',. <br />$499,366,000 <br /> .',;" '. <br />227,895,000 /" .. ",;" <br />11, 960, 000 <br />10, 759, 000 <br />749,980,000 /: <br />506,829,000 ,;' <br />I 2, 000, 000 ... <br />(') <br /> .(. <br />6,415,000 <br />1,265,224,000 <br />81,003,000 <br />1,346,227,000 <br /> ,. <br /> ;.;- <br /> ','<" <br /> <br /> <br />... <br /> <br />18 <br />001802 <br /> <br />THE LOWER COLORADO RlVER BASIN PROJECT <br /> <br />COSTS AND RELATED DATA <br /> <br />The cost of works proposed for authorization in titles I and II <br />of this bill, the allocation of such costs among the various purposes to <br />be served, the benefit-cost ratios and data on repayment are tabulated <br />below: <br /> <br /> <br />Title I: <br />Sec. 104(a). Main stream reservoir unit: <br />Bridge Canyon project, including dam reservoir power- <br />plant, transmission facilities, and appurtenant works_ <br />Marble Canyon ptoject, including dam reservoir, power- <br />plant, transmission facilities, and appurtenant works_ <br />Coconino silt-detentionreservoir_____ _ ______ ___ ___ ___ <br />Paria silt-detention reservoir _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ <br /> <br />Costs <br /> <br />Subtotal, mainstream reservoir unit________________ <br />See, 104(b), Central Arizona unit________________________ <br />See, 104(c); Water quality investigations_________________ <br />Sec. 104(d). Works to be authorized fill units of project_____ <br />See, 104(e) , Outdoor recreation, conservation of scenery, and <br />natural historio and archeologioal objects and fish <br /> <br />and wildIifen___ _ _____________ _____________n___ <br /> <br />Total cost of works authorized in seo. 104____________ <br />Title II: Southern Nevada water supply_____________________ <br /> <br />Total, titles 1 and IL________________________________ <br />I Estimated. <br />I No cost until authorized. <br />