My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11615
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:11 PM
Creation date
10/12/2006 5:04:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.40
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
3/1/1981
Title
Water and Power Resources Service - Southwest Region - to Rio Grande Compact Commission - March 1981
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l~ <br />'" <br />iO <br />'1""1 <br />C' <br />t-.J <br /> <br />. <br /> <br />. <br /> <br />Right-of-way was acquired for Fio Puerco Siphon and the downstream eonneetion <br /> <br />ehannel to Drain Unit No. 7 Extension. Conneetion channel eonstruction is <br /> <br />essentially eomplete. Installation of the siphon is scheduled to begin in <br /> <br />mid-198l. <br /> <br />Some Rio Chama channel improvement work was aceomplished on the Chili Channel, <br /> <br />at the mouth of the Ojo Caliente, and at the Abeytas-Trujillo heading. This was <br /> <br />mostly maintenanee of work previously accomplished under Seetion 404 permits. <br /> <br />SAN JUAN-CHAMA PROJECT, COLORADO-NEW MEXICO <br /> <br />The Upper Rio Grande Basin Projects Offiee in Albuquerque is responsible for <br /> <br />O&M and water-aceounting funetions of the San "uan-Chama Projeet. <br /> <br />Diversion Dams <br /> <br />During 1980, diversions from the three diversion dams were continuous from April 8 <br /> <br />until September 21 when diversions were diseounted due to low water conditions <br /> <br />on eaeh of the three streams. <br /> <br />Bypass requirements on eaeh of the three rivers were usually kept eurrent on a <br /> <br />daily basis; however, when aeeumulated bypass volumes became defieient due to <br /> <br />low flows, no diversions were made during the month until the defieit was <br /> <br />eliminated. The experimental modified operation at Blaneo Diversion Dam eon- <br /> <br />tinued throughout the year. The modified operation, direeted at redueing sedi- <br /> <br />ment problems, is produeing satisfaetory results. Some refinements of the <br /> <br />equipment at Blanco Dam are intended to further improve operations. The <br /> <br />Parshall flumes whieh replaced the 120. V-noteh weirs at river gaging stations <br /> <br />downstream from the three diversion dams were rated through a joint effort of <br /> <br />Colorado and the Serviee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.