My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I-I <br /> <br />I -IA <br /> <br />1-2 <br /> <br />1-3 <br /> <br />1-4 <br /> <br />II -1 <br /> <br />II1-l <br /> <br />1V-l <br /> <br />1V-2 <br /> <br />V-I <br /> <br />V-IA <br /> <br />V-IB <br /> <br />V-2 <br /> <br />V1-l <br /> <br />V1-2 <br /> <br />LIST OF FIGURES <br /> <br />Page <br /> <br />Project Location <br /> <br />11 <br /> <br />Aerial Photographs of Union Park and Proposed <br />Dam and Reservoir Site <br /> <br />llA <br /> <br />Major Project Features <br /> <br />12 <br /> <br />Site Arrangement Pumping/Generation Plant <br /> <br />13 <br /> <br />Willow Creek Collection System <br /> <br />14 <br /> <br />Planning Districts Location Map <br /> <br />26 <br /> <br />Basin Map of Gunnison River <br /> <br />51 <br /> <br />Union Park/Antero Aqueduct Alignment <br />(3 sheets) <br /> <br />57 - 59 <br /> <br />Union Park/Antero Aqueduct Ground Profile <br />and Hydrualic Grade Line <br /> <br />60 <br /> <br />Reconnaissance Geologic Map <br /> <br />76 <br /> <br />Photographs of Union Canyon in the Vicinity of <br />the Union Park Dam <br /> <br />77 <br /> <br />Photographs of the Proposed Location of the <br />Aqueduct Alignment in the Vicinity of Jones <br />Mountain and West Portal of Trout Creek Tunnel <br /> <br />78 <br /> <br />Preliminary Geologic Cross Sections for <br />the Aqueduct (Two Sheets) <br /> <br />7.9 - 80 <br /> <br />Vegetation Map of the Union Park Basin <br /> <br />115 <br /> <br />Photographs Showing Vegetation in the Union <br />Park Site <br /> <br />116 <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.