My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />11-1 <br /> <br />11-2 <br />through <br />II-6 <br /> <br />II1-1 <br /> <br />111-2 <br /> <br />I I I -3 <br />I I I -4 <br /> <br />I II-5 <br /> <br />111-6 <br />1II-7 <br /> <br />I I I -8 <br />111-9 <br />1V-l <br />V-I <br />V1-1 <br /> <br />VI-2 <br /> <br />VII -1 <br /> <br />LIST OF TABLES <br /> <br />Page <br /> <br />Current and Projected Ground Water Supply in <br />Arapahoe County <br /> <br />20 <br />21 - 25 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />56 <br />75 <br /> <br />Estimated Water Demand <br /> <br />Summary of EBASCO's (1986) Hydrology <br /> <br />Virgin Flows of Taylor River Below Taylor Park <br />Reservoir, (Recorded Flow + Change in Taylor <br />Park Storage) - <br /> <br />Summary of Estimated Project Yields (Wheeler - 1989) <br /> <br />Hydrologic Characteristics of Three Selected Gaging <br />Stations <br /> <br />Minimum Streamflow Requirements (CWCB) <br />Minimum Streamflow Provisions (Case No. 82CW340) <br /> <br />Monthly Releases from Taylor Park Reservoir <br /> <br />Amount of Water Placed into Storage in Union Park <br />Reservoir in Approach 1 <br /> <br />Yield of Union Park Reservoir <br /> <br />Yield of Union Park Reservoir in Approach 3 <br /> <br />Water Demands of the Denver ~ater Department System <br /> <br />Rock Lithology and Distribution for Each Tunnel <br /> <br />Union Park Reservoir Vegetation Community Acres <br />Directly Affected by the Three Storage Capacity <br />Alternatives <br /> <br />113 <br /> <br />Union Park Reservoir Jurisdictional Wetland Acreages <br />Directly Affected by the Three Storage Capacity <br />Alternati ves <br /> <br />114 <br />119 - 120 <br /> <br />Union Park Project Cost Estimate <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.