My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />II <br />II <br />II <br />I <br />II <br />II <br />II <br />II <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. <br /> <br />Taylor River Diversion <br />The diversion point on Taylor River on the shore of Taylor Park <br />Reservoir is located at a point South 83021102" West a distance of <br /> <br />11, :)54 .04 feet from the Northwest corner of Secti on 21, Townsh i p 14 <br />South, Range 82 West of the 6th P.M. in Gunnison county, Colorado. <br />Water will be pumped from the Taylor River at Taylor Park Reservoir <br />by the Taylor Park Pumpi ng Pl ant and through an unnamed tunnel to <br />Union Park Reservoir. The pumping facilities and tunnel are <br /> <br />designed to carry 1,000 cfs. <br /> <br />4. <br /> <br />Pumping/Generation Plant <br />A pump/turbine systel]1 is proposed for the water transfer facil ity <br /> <br />because of its proven history of providing reliable service. The <br /> <br />system can operate in a normal pumped-storage mode during the <br /> <br />periods when transfer to long-term storage in Union Park Reservoi r <br /> <br />is not bei ng made. Fi gure / I -3 presents a si te arranyelilent for <br /> <br />this plan. <br /> <br />The size of the pump/turbine was selected to meet the expected <br /> <br />maximum inflow in other than extreme flood conditions. <br /> <br />Based on <br /> <br />review of the Taylor Park Reservoir release record to date, a 1,000 <br /> <br />cfs pumping rate would meet all but the extremely high and rare <br />inflow conditions. The pumping rate of 1,000 cfs and a design head <br />of 600 feet results in a unit capacity of 60 MW. The maximum unit <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.