My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />On August 29,1988 NECO (seller) and Arapahoe County (purchaser) signed <br />an agreement for sale of the Union Park Project. Under the provisions of <br />the agreement the County acquired 1) A conditional decree to store <br />approximately 325,000 acre-feet of water for power purposes in the Union <br />Park Reservoir issued by the Water Court in Montrose in Case No. 82CW340. <br />2) Water storage rights for municipal and transmountain diversion <br />pu rposes at Uni on Park Reservoi r fil ed by NECD with the Water Court in <br />Montrose in Case No. 86CW226. 3) All other facilities, structures, <br />rights-of-way, governmental permits, titles, and interests associated <br />with the Union Park Project. From the original decree in Case No. <br />82CW340, NECD retained 4,450 acre-feet at the Rocky Point Reservoir <br />alternate point of diversion. <br /> <br />The County became a substitute Applicant in Case Nos. 86CW226 and 88CWD20 <br />filed by NECO and which are currently pending with the Water Court in <br />Montrose. In addition, Arapahoe County has filed an appl ication with the <br />Water Court in Case No. 88CW178, requesting conditional storage rights, <br />surface water rights, and for a change of water rights. <br /> <br />D. General Project Description <br />The Union Park Project is comprised of a number of different facilities <br />aimed at diverting, storing and delivering unappropriated water to <br />Arapahoe County. These facil ities include Union Park Dam, Union Park <br />Reservoir, aqueduct (tunnels and conduits) to deliver water from Union <br />Park Reservoir to South Platte Basin upstream of Antero Reservoir, Taylor <br />River Diversion, and a pumping / power generation plant. The Taylor Park <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.