My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11573
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:04 PM
Creation date
10/12/2006 5:03:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.766
Description
Gunnison River General Publications - Correspondence - Reports - Etc
State
CO
Basin
Yampa/White
Water Division
6
Date
3/1/1993
Author
Unknown
Title
Scoping Report for the Gunnison River Contract - Analysis Notebook - Section I - Comments by Source
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />tr-f2i, <br /> <br />i;~3J;~f,! <br /> <br />.'-... <br /> <br />,..~ ,'C' <br /> <br />M1M'l <br /> <br />Public Scoping Comments, Gunnison River Contract, cent. <br /> <br />STUDY. <br /> <br />STUDY. <br /> <br />3b. <br /> <br />STUDY. <br /> <br />6. 5. <br /> <br />16aJ. 5. <br /> <br />16aJ. 5. <br /> <br />5. 25. Hydrologic study needed for EIS: sediment study needed to determine <br />flushing flow needs. <br /> <br />5. <br /> <br />5. <br /> <br />27. <br /> <br />26. <br /> <br />Stanford/Ward and other biological studies need to be used/included in EIS. , <br /> <br />5. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />b. Contract should be written to quantify Monument right. <br /> <br />27. <br /> <br />Studies should be done hy quali fied people. <br /> <br />Concerned that test flows were made before studies done. Should know effects first. <br /> <br />Concenied with floods in North Della if peaks are added to each other. <br /> <br />Flood control structures (dikes) should be cbecked (along Gunnison River). <br /> <br />19a. 5. 31. Western Slope Energy: If AB Lateral built, concerned that this will affect outcome of <br />flows in contract. <br /> <br />6. <br /> <br />5. <br /> <br />32. <br /> <br />Location where you want high flow needs to be specifically defined. <br /> <br />13b. <br /> <br />5. 33. If contract or endangered fish flows lead to senior water rigbt calls, how are juniors <br />affected? Where will juniors get water and at what cost? <br /> <br />8. <br /> <br />14a. <br /> <br />22. <br /> <br />22. <br /> <br />7b. <br /> <br />5. <br /> <br />34. <br /> <br />Hate to see us negotiate away integrity of park and recreational values. <br /> <br />Hate to see us negotiate away integrity of park and recreational values. <br /> <br />Concerned that meetings will not remain open to public due to contract process <br /> <br />Bring decision process to people. <br /> <br />5. <br /> <br />37. Concerned that Colorado water law may conflict with contract. <br />-May need to amend, change state water law to achieve contract goals <br /> <br />la. 5. 38. Need to identify bow much Bureau of Reclamation (Blue Mesa) water is benefitting <br />water users today. <br /> <br />5. <br /> <br />34. <br /> <br />5. 35. <br />(closed door). <br /> <br />5. <br /> <br />36. <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.