Laserfiche WebLink
<br />" <br /> <br />/i~{J:i:~~ <br />:,. '., ~:.. <br /> <br />~-. <br />,).)f;;l <br />;;::::::.:~~. .' <br /> <br />~ .~ '::~:<..., <br />';:..r...':.,." <br /> <br />C01.599 <br /> <br />Public Scoping Comments, Gunnison River Contract, conI. <br /> <br />22. 5. 01. Different concerns expressed in City of Gunnison. Would help to understand their <br />concerns. Need to share information, <br /> <br />3h. <br /> <br />02. <br /> <br />Federal reserved right (for the Monument) needs to be quantified soon. <br /> <br />5. <br /> <br />3h. <br /> <br />03. <br /> <br />More explanation needed on National Park Service reserved right. What is amount? <br /> <br />5. <br /> <br />7b. 5. 04. Who owns 300 cfs donated right? Will it go to National Park Service? --Would like <br />to see it guaranteed through canyon to Grand Junction. <br /> <br />13b. 5. 04. Who owns 300 cfs donated right? Will it go to National Park Service? -Would like' <br />to see it guaranteed through canyon to Grand Junction. <br /> <br />17. 5. 05. If flow regimes change, and peaking power reduced or bypasses increase, CREDA <br />will complain. Look at increasing power cost to market level; don't sacrifice recreation, etc. Also <br />look at efficiency and "demand-size management' as alternatives to make-up hydopower reduction. <br /> <br />20b. 5. 05. If flow regimes change, and peaking power reduced or bypasses increase, CREDA <br />will complain. Look at increasing power cost to market level; don't sacrifice recreation, etc. Also <br />look at efficiency and 'demand-size management" as alternatives to make-up hydopower reduction. <br /> <br />1'7. <br /> <br />5. <br /> <br />06. -What amount power would be lost - in kilowatts and dollars. <br />-What is effect of this on Aspinall Unit repayment? What is cost to consumer? <br />(Local/Regional) <br />-How is power replaced? <br /> <br />17. <br /> <br />5. <br /> <br />07. <br /> <br />WiIlthere really be a power loss, or will time of power generation change? <br /> <br />17. 5. 08. ,If there is power loss and power is replaced by other means, what are environmental <br />effects of replacement? <br /> <br />18. <br /> <br />5. <br /> <br />09. <br /> <br />Concerned. with economic effects - agriculture, recreation, tourism. <br /> <br />16a1. 5. <br /> <br />10. Corp of Engineers/FEMA made floodplain maps based on post-Aspinall conditions. <br />-Will contract affect these maps/dala? <br />-Will structures 'end up" in different flood-frequency category? <br /> <br />STUDY. 5. 10. Corp of Engineers/FEMA made floodplain maps based on post-Aspinall <br />conditions. <br />-Will contract affect these maps/data? <br />,-Will structures "end up' in different flood-frequency category? <br /> <br />13c. 5. 11. If winter flows lower, due to contract or water calls, discharge permit (in compliance <br />with Section 402 of the Clean Water Act) parameters could be affected. This could cost towns/citizens <br />as they apply to Della and other towns. Should ask Colorado Health Department to identify. <br /> <br />21 <br />