Laserfiche WebLink
<br />ment Planning, include: <br /> <br />Identification of all required treatment works and a plan to finance <br />construction and operation. <br /> <br />Construction priorities including a schedule for initiation and <br />completion of all projects. <br /> <br />Establishment of a regulatory program for construction and manaoement <br />of all treatment works. <br /> <br />Identification of the agency(s) required to implement the Plan. <br /> <br />Identification of the measures required to carry out the Plan, the <br />Plan duration, and the cost of carrying out the Plan including the <br />economic, social, and environmental impact. <br /> <br />Identification and measures for control of: <br /> <br />Agricultural and silvicultural sources of pollution <br />Mining sources of pollution <br /> <br />Construction related sources <br /> <br />Generated residual wastes (sludges, solid waste, etc.) <br />Land disposal of all wastes <br /> <br />Evaluation of air pollution problems. <br /> <br />Correlation with transportation plans. <br /> <br />Gecause of the impact on local people and the need/desire to have the <br /> <br />public participate in fhe planning process as much as possible, it was de- <br /> <br />cided to develop a preliminary framework plan at this time rather than await <br /> <br />completion of numerous ongoing studies. This Plan is the subjpct of this <br /> <br />summary and is intended to stimulate the public's interest by providing a <br /> <br />cOGmon base for discussions. It is intended to present the frama\'lork plan <br /> <br />at public meetings throughout the Study Area and mold the olan into a draft <br /> <br />final plan by November 1977. <br />The preliminary framework plan addresses all of the elements required <br /> <br />of a 20B Plan for the Colorado River and White River portions of the Study <br /> <br />- r'" -'. <br />~ \ 'I ;'.f \.. .- <br />V ~.' Iw .., ;.; tJ <br /> <br />- 2 - <br />