My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11446
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:29 PM
Creation date
10/12/2006 4:59:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.I
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
10/1/1979
Author
USDOI-BOR
Title
Endangered Species Assessment: Dallas Creek Project Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />5. Construction Status <br /> <br />On January 14, 1977 a repayment contract for the project was executed <br /> <br />between the United States and the Tri-County Water Conservancy District. <br /> <br />For the purpose of establishing the interest rate during construction as <br /> <br />defined in Paragraph 489.1.8 of the Reclamation Instruction construction was <br /> <br />I <br /> <br />initiated July 8, 1977, with the disbursement of $515,000 for land acquisition <br /> <br />and highway relocation planning. <br /> <br />Land acquisition for the project began in 1977 and approximately 3100 <br /> <br />acres have'been purchased to date. This includes about 65 percent of the <br /> <br />'I <br />, <br /> <br />wildlife mitigation lands. Total land acquisition was over 85 percent complete <br /> <br />on October 1, 1979. <br /> <br />, <br />~ ! <br /> <br />, <br /> <br />:; <br /> <br />On September 29, 1977 the United States and the Colorado Department of <br /> <br />Highways signed a contract ~o relocate U.S. Highway 550 around the reservoir. ~' <br /> <br />Actual field construction began in July, 1978 and the work was 85 percent <br /> <br />'.; <br /> <br />'i,' <br /> <br />complete as of October 1, 1979. This work includes construction of 8.2 miles <br /> <br />of deer fence. <br /> <br />.~: <br /> <br />A contract was executed in May, 1978 between the United States and the <br /> <br />;? <br />" <br />~!, <br />~." <br />Ie,' <br />?! <br />~ <br />.~; <br />~: <br />~ <br />1 <br />~ <br />~ <br /> <br />San Miguel Electric Association to relocate a powerline around the reservoir. <br /> <br />The relocation as of October 1, 1979 was 80 percent complete. Relocation <br /> <br />of telephone lines around the reservoir is also approximately ,80 percent <br /> <br />complete. Construction of the field station at Ridgway Reservoir was completed <br /> <br />in August, '1978. <br /> <br />',~, I <br />'I <br />,> <br /> <br />A pre- and post-project water quality monitoring program was initiated <br /> <br />in 1977 in cooperation with the Environmental Protection Agency and will <br /> <br />continue into project operation. <br /> <br />6 <br />