Laserfiche WebLink
<br /> Table 1 <br /> Comparison of Uncompahgre River flov.'s at Colona <br /> with and without the project <br /> (Unit--second-feet) <br /> Pre-project Post-pro;ect <br /> Average Maximum Minimum Average Maximum Minimum <br />Monthly monthly daily daily monthly daily daily <br />November 102 240 50 69 148 45 <br />December 84 194 42 63 107 45 <br />January 72 300 30 57 81 45 <br />February 76 334 35 57 92 45 <br />March 96 346 50 68 128 45 <br />April 215 861 36 158 408 57 <br />May 501 2J170 12 426 1,282 107 <br />June 794 2,600 132 753 1,329 203 <br />July 396 2,370 70 505 1,236 259 <br />August 215 916 32 252 532 104 <br />September 125 1,420 12 108 400 35 <br />October 108 364 16 90 228 33 <br />Fishing easements on a willing seller basis will be acquired along both <br /> <br />, <br /> <br />.1', <br /> <br />" <br />> <br />.~ <br />~ <br />~ <br /> <br />sides of the Uncompahgre River for about 12 miles downstream from Ridgway Dam. <br /> <br />Project funds are being utilized for acquisition and initial development for <br /> <br />., <br /> <br />approximately 1,000 acres of land for intensive development as a wildlife manage- <br /> <br />ment area. With the exception of the two planned recreation sites, all lands <br /> <br />,,' <br /> <br />':~ <br /> <br />not inundated within the reservoir right-of-way boundary will also provide <br /> <br />ff <br /> <br />" <br />" <br />..' <br /> <br />To reduce the incidents of vehicle-deer collisions, an 8-foot high deer <br /> <br />" <br />~ <br />,.~. <br />I:' <br />I' <br />~: <br />j <br />~.$ <br />~ <br />~ <br />~ <br />~~ <br />~ <br /> <br />wildlife habitat. <br /> <br />fence has been built as part of the Dallas Creek Project along an 8.2 mile <br /> <br />section of U.S. Highway 550. The power line being relocated around the <br /> <br />reservoir is being constructed raptor-proof to reduce the possibUiry of raptor <br /> <br />:;.1 <br />',:- <br /> <br />electrocution. <br /> <br />,., <br /> <br />5 <br />