My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11346
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:04 PM
Creation date
10/12/2006 4:55:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River Basin Salinity Control Program - General Information and Publications-Reports
Basin
Colorado Mainstem
Water Division
5
Date
6/24/1974
Author
EA Lundbergh
Title
Introduction and Project Outline -- Title I - Colorado River Basin Salinity Control Project -- Public Law 93-320 -- June 24 1974 -- Public hearing for draft EIS
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />N <br />..... <br />W <br />r' <br /> <br />, . <br /> <br />. <br /> <br />. <br /> <br />ava il ab 1 e short 1y. The data deri ved from the i nventor-i es wi 1 ~ enable the <br /> <br />accurate enumeration of losses so that mitiqation can be made on an <br /> <br />equitable basis. ~1it'igation features for fish, wildlife and recreation <br /> <br />losses are under study. Two examples are methods to maintain the Hunter'!; <br /> <br /> <br />Ho'le complex and methods to replace fish and wildlife losses in the Yuma <br /> <br />Valley drains and the river below Morelos Dam. <br /> <br />The eventual loss of fish and wl1dlife resources is a very real concern <br /> <br /> <br />to Reclamation and every effort is being made to comply with the Fish and <br /> <br />Wildlife Coordination Act. <br /> <br />2. SOURCE OF POWER <br /> <br />Subsequent to the issuance of the Draft Environmental Impact Statement dated <br /> <br />April 1, 1974, which occurred during the time the recent fuel shortage <br /> <br />prob 1 em was recei vi ng nati ona 1 attenti on, we recei ved numerous comments <br /> <br />questioning the availability and source of energy for the salinity project. <br /> <br />This matter is now under study by the Bureau of Reclamation working with <br /> <br /> <br />the various entities who are or could be involved. Before a source of <br /> <br />energy can be finally determined, this quantity of energy required must <br />be known. The information on the actual energy capacity requirement will <br />not become available until contracts are awarded for purchase of equipment, <br /> <br />- <br />which is scheduled for fiscal year 1976. <br /> <br />10 <br /> <br />. <br /> <br />,_ d~ ,_L _. ~ ,_~_ <br /> <br />.,-' ---- <br />.s. _ ~ -, 0.'" ".i,.-",,,,,,.i...d, ~j"k,_-",,--;;..g'-"_;';'''''~.f,.A,~:<.;i:,-sili,. <br /> <br /> <br /> <br />.', <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.