My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11325
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:59 PM
Creation date
10/12/2006 4:53:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Unit - Reports
State
CO
Basin
South Platte
Water Division
1
Date
3/1/1978
Author
Woodward-Clyde Consu
Title
Review Of Data And Studies Developed By The Bureau Of Reclamation For The Feasibility Stage Design Of Narrows Dam Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />.; ~~; <br /> <br />Woodward.Clyde Consultants <br /> <br />. <br /> <br />. <br /> <br />site. A listing of the material received is included in the <br /> <br /> <br />references, Appendix A. <br /> <br /> <br />On November 22, 1977 the wee panel members met Messrs. <br /> <br /> <br />Griffin and Bennett at the Ft. Morgan project office and toured <br /> <br /> <br />the dam site and borrow area sites with them and other members <br /> <br /> <br />of the project office. <br /> <br /> <br />2. Scope of Work <br /> <br /> <br />The principal objectives of this study were to provide <br /> <br /> <br />geotechnical engineering services for the purpose of <br /> <br /> <br />formulating conclusions concerning the safety of the proposed <br /> <br /> <br />dam and foundation utilizing data available from the Bureau of <br /> <br /> <br />Reclamation's feasibility stage design studies which were <br /> <br /> <br />supplied to us, an on-site engineering and geologic recon- <br /> <br /> <br />naissance, and independent studies and analyses. Narrative <br /> <br /> <br />discussions concerning the wee panel's field observations, <br /> <br /> <br />design data, design review, studies and analyses, which led to <br /> <br /> <br />our conclusions and recommendations are included in this <br /> <br /> <br />report. <br /> <br /> <br />Our evaluations of the safety of the dam and foundation <br /> <br /> <br />were limited to the geotechnical assessment of the dam and its <br /> <br /> <br />foundation. Our evaluations did not include, nor were we asked <br /> <br /> <br />to include, other important overall considerations including <br /> <br /> <br />hydrology, flood control criteria, downstream flood flow, <br /> <br />. <br /> <br />l <br /> <br />, <br /> <br />. <br /> <br />- 3 - <br /> <br />fit <br />
The URL can be used to link to this page
Your browser does not support the video tag.