<br />April to allow annual maintenance at the Pole Hill Powerplant.
<br />Following maintenance, Adams Tunnel diversions will be. increased
<br />when possible to complement "operation skim" to maintain Olympus
<br />Tunnel flows near capacity. Terminal storage will reach 163,600
<br />acre-feet by the end of May. This represents about 62 percent of
<br />the total capacity available in Carter Lake and Horsetooth Reservoir.
<br />During June and July, transmountain diversions will be limited to
<br />maximize the diversions from the Big Thompson River under "operation
<br />skim." Irrigation deliveries should begin frora Carter Lake in May
<br />and from Horsetooth Reservoir in June. Following a seasonal delivery
<br />of 206,000 acre-feet, the carryover storage in Carter Lake and
<br />Horsetooth Reservoir will be about 36 percent of normal.
<br />
<br />~~:((.
<br />
<br />~;~~f::...
<br />~Jr~f
<br />.....,..
<br />". ,#,.....
<br />. .~r.~~..:.'.
<br />~:;~:><. ~.
<br />-~.:~;::;;..~ "
<br />_'v,,.
<br />-':~:.;..:':-,
<br />
<br />~\ri~;'
<br />~-:~::(j~.
<br />:......J.
<br />
<br />Lake Granby
<br />
<br />.... .'
<br />......
<br />,ri0:if
<br />.......;'...::.
<br />:;:.'-/-_....;..
<br />.....:;~.. -'~
<br />
<br />Releases from Seminoe and Kortes Powerplants will be reduced from
<br />1,200 ft3/s during January to an average of about 800 ft3/s for
<br />February and March. From April through June, turbine releases will
<br />average about 820 ft3/s. With most probable inflow conditions, the
<br />reservoir will fill to a content of 772,500 acre-feet by the end of
<br />July. During July and August, turbine releases will average about
<br />885 ft3/s. An average turbine release of 500 ft3/s during September
<br />will result in a yearend storage of 726,200 acre-feet. This is
<br />109 percent of the most recent 10-year average.
<br />
<br /><b:')
<br />.:-:..,'
<br />
<br />:;'-.':.:..;' ~;:.
<br />
<br />
<br />I
<br />J1
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />.-;;...;:........
<br />
<br />~~t
<br />~
<br />
<br />
<br />';t.:~.~'"'<.
<br />'. '.~. ::.
<br />':;':~. .r:..
<br />j.:~~~i~\
<br />;.-'. " .~. ~ .
<br />:i<~;. ;'.:-=
<br />(/.~~..::;,:.:I
<br />
<br />Storage in Lake Granby will he lowered to about 100,000 acre-feet
<br />by the end of April and refilled to a yearly maximum of about
<br />243,000 acre-feet by the end of July. A reservoir content of 196,000
<br />acre-feet at the end of Water Year 1978 will be 47 percent of average.
<br />
<br />Seminoe
<br />
<br />Pathfinder
<br />
<br />Fremont Canyon releases during February and March will be scheduled
<br />to maintain Alcova Reservoir's content at 155,900 acre-feet. By
<br />increasing the releases in April to an average of 920 ft3/s, Alcova
<br />Reservoir will refill to the normal summer operating level by the
<br />end of the month. Releases from May through September will be scheduled
<br />to meet downstream irrigation deliveries and to maintain a storage
<br />content of 179,000 acre-feet in Alcova Reservoir. During July and
<br />August, Fremont Canyon Powerplant releases will be near capacity at
<br />2,280 ft3/s. Pathfinder Reservoir's storage at the end of the water
<br />year will only be 31 percent of the recent la-year average, or
<br />108,000 acre-feet.
<br />
<br />..~.:.:.~~;:~: "
<br />
<br />26
<br />
<br />j::~:Y<::.
<br />
<br />...:..,.....
<br />
<br />.....:...,.
<br />.;.~..;:;;; ,
<br />
<br />:{.':' ~..::<
<br />
<br />:0:;>--'
<br />
<br />., '-~'." .
<br />
<br />..
<br />,....-
<br />
<br />,:{::~p<,';;)s:.:t~:.::r'~f-:~.?.>/.';.:;:.,:;<..::;.
<br />
<br />.'......'.>.... .-^. .. .'
<br />
<br />..' -. ":;~} .::.~:::~,f:.:.~
<br />
<br />
<br />-:::.-....:
<br />
<br />c:' ..;....'.
<br />
<br />,,' . .,..:;:.<:.t:::',. ;:,:')/~g2:~H!<":E\'
<br />.,.,....,....,... ;"'. .....
<br />
|