My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11284
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:50 PM
Creation date
10/12/2006 4:52:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1966
Author
Unknown
Title
Quarterly Reports - Arizona-Colorado-Nevada - 1966-1967
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />001581 <br /> <br />. <br /> <br />f <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br /> <br />66-1 Meeting <br /> <br />Construction <br /> <br />Blue Mesa Dam of the CURECANTI UNIT has been topped <br />out and, -except for riprap remaining to be placed on the upstream <br />face of the dam, the contractor has completed placement of fill in <br />the dam. After closure of the diversion tunnel on October 27, <br />storage of water behind Blue Mesa Dam began. The water impounded <br />has already formed a lake approximately 12 miles long. The <br />powerplant structure at the toe of the dam is essentially complet- <br />ed. Work remaining under the prime contract includes placement of <br />the downstream plug in the diversion tunnel, work on excavation <br />for the channel improvement below the dam, surfacing the highway <br />across the crest of the dam, and modification of the outlet works-- <br />most of which is well under way. The upstream plug in the diversion <br />tunnel is in place and completed. Overall completion under the <br />prime contract is over 98 percent. <br /> <br />On December 2 a $1,245,000 contract was awarded to the <br />Eagle Construction Corporation of Loveland, Colorado, for comple- <br />tion of the Blue Mesa Powerplant, to include installation of <br />turbines, generators, and other electrical equipment, and construc- <br />tion of the switchyard for the plant. The powerplant is scheduled <br />to go into operation in early 1967. <br /> <br />All work under the contract to clear Blue Mesa Reservoir <br />has been accomplished. <br /> <br />At Morrow Point Dam, virtually all outside work has come <br />to a halt due to the cold weather. Concrete placements in the <br />dam as well as other outside work will be resumed in the spring as <br />soon as weather permits. Underground excavation, drilling and <br />installation of rock bolts, tunnel supports and chain-link fabric <br />continues in the Penstock and foundation tunnels and in the power- <br />plant chamber. Work under the contract is almost 40 percent com- <br />pleted. <br /> <br />The difficult access road into the crystal damsite--third <br />of the three major dams comprising the Curecanti unit--is substan- <br /> <br />.':1.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.