Laserfiche WebLink
<br />002966 <br /> <br />. <br /> <br />. <br /> <br />Demand Charge: $10.52 per mont per KW of demand <br /> <br />Energy Charge: $0.04309 per KWH <br /> <br />Minimum Charge: $1.50 per transformer KVA or $75 per month <br /> <br />whichever is larger. The minimum does not apply if the annual <br /> <br />electric charge is greater than the annual minimum charge. <br /> <br />EEA's policy for extending service to irrigation loads includes a <br /> <br />construction deposit determined as follows: <br /> <br />Determine the total construction cost for the service. <br /> <br />Estimate the annual revenue produced over 5 years. <br /> <br />Calculate the wholesale power cost for the 5 year period and <br /> <br />determine the net revenue. <br /> <br />Calculate the deposit based on the difference between the <br /> <br />construction cost and the net revenue. <br /> <br />The deposit is refundable at 10 percent per year for the first 10 <br /> <br />years for revenue in excess of the annual minimum standby charge. <br /> <br />The cost involved in extending service for new users is subject to the <br /> <br />requirements of the specific service, but the approximate cost (1) is <br /> <br />$12,000 per mile for single phase and $21,000 per mile for three <br /> <br />phase. An example of the required construction deposit (consumer <br /> <br />advance) for a line extension is attached in Appendix D-2.2. <br /> <br />2.2.4 Electric Service Connection Procedure <br /> <br />The procedural steps for connecting to the La Plata and Empire <br /> <br />Electric associations systems are similar. The general steps are <br /> <br />5 <br /> <br />1::::1 <br />.7'> <br />