My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11023
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:42 PM
Creation date
10/12/2006 4:40:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.700
Description
Federal Water Rights - Colorado Litigation - Ute Indian Reservations
State
CO
Basin
Statewide
Water Division
7
Date
2/8/1985
Author
Unknown
Title
Colorado Ute Indian Agricultural Engineering Study - Design and Cost Estimates for Off-Farm Irrigation Facilities
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UU4~b~ <br /> <br />. <br /> <br />. <br /> <br />extension, but the amount refunded each year shall not exceed 10 <br /> <br /> <br />percent of the original deposit. The electric association may <br /> <br />declare an "indeterminate" facility "permanent", recompute the <br /> <br />balance eligible for refund, and refund the excess deposit. The <br /> <br /> <br />question of whether a service would be classified as permanent <br /> <br />according to the Association's policy would be based on assurance of <br /> <br />continuous use of the line and adequate power consumption to <br />economically justify the line. <br /> <br />2.2.3 Empire Electric Facilities and Rates <br /> <br /> <br />Current power rates and line extension policies as obtained from the <br /> <br /> <br />Empire Electric Association (EEA) on December 10, 1984, and <br /> <br /> <br />effective beginning November, 1981, to December, 1982, depending on <br /> <br /> <br />the specific service are attached in Appendix D-2.2. The rates for <br /> <br /> <br />small power services, less than 50 KW, are as follows: <br /> <br />Facilities Charge: $10 per month for single phase or $20 per <br />month for three phase. <br />Electric Charge: $0.065039 per KWH <br />Minimum Charge: The facilities charge except when 10 KVA of <br />capacity is required, the minimum is the facilities charge plus <br /> <br />$1.00 per KVA for single phase or $1.50 per KVA for three phase <br /> <br />service per month. <br /> <br />Power loads larger than 50 KW are also considered large service by the <br /> <br /> <br />Empire Electric Association. The.rates for large service are as <br /> <br />follows: <br /> <br />4 <br /> <br />.. <br /> <br />", .. -- :,t:l;k <br />
The URL can be used to link to this page
Your browser does not support the video tag.