Laserfiche WebLink
<br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />11.5.5 Plan E: Trailhead Reservoir; Existing North <br />Poudre Supply Facilities; Glade Reservoir; and <br />New Halligan Reservoir <br />11.5.5.1 Glade Reservoir <br />11.5.5.2 Trailhead Reservoir <br />11.5.5.3 New Halligan Dam and Reservoir <br />11.5.5.4 Other Features <br />11.5.5.5 Cost Estimates for Plan E <br />11.5.6 Plan Bl: Grey Mountain Reservoir; Glade Tunnel; <br />Glade Reservoir; and Greyrock Mountain Pumped- <br />Storage Project <br />11.5.6.1 Grey Mountain Dam and Reservoir <br />11.5.6.2 Glade Dam, Reservoir, and Tunnel <br />11.5.6.3 Greyrock Mountain Pumped-Storage Project <br />11.5.6.4 Other Features <br />11.5.6.5 Cost Estimate for Plan 81 <br />11. 5.7 Pl an Cl: Poudre Reservoi r; Glade Tunne 1 ; <br />Glade Reservoir; Greyrock Mountain Pumped- <br />Storage Project (450 MW) <br />11.5.7.1 Poudre Dam and Reservoir <br />11.5.7.2 Glade Dam, Reservoir, and Tunnel <br />11.5.7.3 Greyrock Mountain Pumped-Storage Project <br />11.5.7.4 Other Features <br />11.5.7.5 Cost Estimates for Plan Cl <br />11.5.8 Pump-Back Project From Cache la PoudreNear <br />Greeley <br />11.5.9 Raising Horsetooth Dam and Reservoir <br /> <br /> <br />-13- <br /> <br />Page <br /> <br /> <br />11-40 <br />11-42 <br />11-42 <br />11-42 <br />11-43 <br />11-43 <br /> <br />11-43 <br />11-45 <br />11-45 <br />11-45 <br />11-45 <br />11-46 <br /> <br />11-46 <br />11-4B <br />11-48 <br />11-48 <br />11-48 <br />11-49 <br /> <br />11-49 <br />11-51 <br /> <br />~ <br />