Laserfiche WebLink
<br />TABLE OF CONTENTS (Continued) <br /> <br />11.5.2 Plan B: Grey Mountain Reservoir; Trailhead <br />Reservoir; and Greyrock Mountain Pumped-Storage <br />Project <br />11.5.2.1 Grey Mountain Dam and Reservoir <br />11.5.2.2 Trailhead Dam and Reservoir <br />11.5.2.3 Greyrock Mountain Pumped-Storage Project <br />11.5.2.4 Other Features <br />11.5.2.5 Cost Estimate for Plan B <br />11.5.3 Plan C: Poudre Reservoir; Glade Tunnel; Glade <br />Reservoir; and Greyrock Mountain Pumped-Storage <br />Project <br />11.5.3.1 Poudre Dam and Reservoir <br />11.5.3.2 Glade Dam, Reservoir, and Tunnel <br />11.5.3.3 Greyrock Mountain Pumped-Storage Project <br />11.5.3.4 Other Features <br />11.5.3.5 Cost Estimate for Plan C <br />11.5.4 Plan D: Footbridge Reservoir; Bypass Tunnel; <br />New Seaman Reservoir; Glade Tunnel; Glade Reservoir; <br />and Greyrock Mountain Pumped-Storage Project <br />11.5.4.1 Footbridge Dam and Reservoir <br />11.5.4.2 Bypass Tunnel <br />11.5.4.3 New Seaman Dam and Reservoir <br />11.5.4.4 Glade Dam, Reservoir, and Tunnel <br />11.5.4.5 Greyrock Mountain Pumped-Storage <br />Project <br />11.5.4.6 Other Features <br />11.5.4.7 Cost Estimate for Plan D <br /> <br />-12- <br /> <br /> <br /> <br />I <br />I <br /> <br />Page <br /> <br /> <br />11-27 I <br />- <br />11-27 <br />11- 29 ~ <br />11-29 <br />11-29 <br />11-30 , <br />11-30 II <br />11-30 I <br />11-33 <br />11-34 <br />11-34 <br />11-35 <br /> <br />11-35 <br />11-35 <br />11-37 <br />11-37 <br />11-38 <br /> <br /> <br />11-38 <br />11-39 <br />11-40 <br />