Laserfiche WebLink
<br />TABLE OF CONTENTS (Continued) <br /> <br />12.0 EVALUATION OF ALTERNATIVE PLANS <br />12.1 TECHNICAL EVALUATION <br />12.1.1 Water Storage and Yield <br />12.1.2 Power Output <br />12.1.3 Flood tontrol Opportunities <br />12.1.4 Water Management Flexibility <br />12.1.5 Operational Reliability <br />12.1.6 Risk of Construction Delay and Cost Increase <br />12.2 ENVIRONMENTAL EVALUATION <br />12.2.1 Evaluation Process <br />12.2.2 Environmental Evaluation of Alternative Plans <br />12.2.2.1 Plan A <br />12.2.2.2 Plan B <br />12.2.2.3 Plan C <br />12.2.2.4 Plan D <br />12.2.2.5 Plan E <br />12.2.2.6 Plan B1 <br />12.2.2.7 Plan C1 <br />12.2.3 Environmental Evaluation Summary <br />12.2.4 Endangered Species on the Platte River <br />12.2.5 Enhancement Opportunities <br />12.3 ECONOMIC EVALUATION <br />12.3.1 Economic Costs <br />12.3.1.1 Project Costs <br />12.3.1.2 Dwelling Unit Inundation Costs <br />12.3.1.3 Cost of Lost Recreation <br />12.3.2 Economic Benefits <br />12.3.2.1 Pumped-Storage Benefits <br />12.3.2.2 Conventional Hydropower <br />12.3.2.3 Additional Water Supplies <br /> <br />!-i <br />i'j" <br />"I <br />I <br /> <br />-14- <br /> <br />Page <br /> <br />12- 1 <br />12- 1 <br />12- 1 <br />12- 1 <br />12- 2 <br />12- 3 <br />12- 3 <br />12- 4 <br />12- 6 <br />12- 6 <br />12- 7 <br />12- 7, <br />12- 9 <br />12-10 <br />12-11 <br />12-11 <br />12-12 <br />12-12 <br />12-12 <br />12-14 <br />12-15 <br />12-17 <br />12-17 <br />12-17 <br />12-19 <br />12-20 <br />12-22 <br />12-23 <br />12-25 <br />12-26 <br />