My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10958
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:26 PM
Creation date
10/12/2006 4:37:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1973
Author
USDOI
Title
Seventeenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />ENVIRONMENTAL ACTIVITIES <br /> <br />The National Environmental Policy Act <br />(P.L.-190) requires thai the Federal <br />Government, in its activities, maintain <br />conditions which will encourage pro- <br />ductive and enjoyable harmony be- <br />tween man and his environment. Envi. <br />ronmental impact statements (EIS) <br />must be prepared on major Federal <br />actions significantly aHecting the qual- <br />ity 01 human environment. Where envi- <br />ronmental statements are required. a <br />draft is prepared and comments are <br />obtained from interested governmental <br />and private organizations. The com- <br />ments are used in preparation 01 a final <br />environmental slatement which. like the <br />draft, is also filed with the Council on <br />Environmental Quality and furnished to <br />interested organizations. <br />In Fiscal Year 1973. final environmental <br />statements were prepared and filed with <br />the Council on Environmental Quality <br />on Crystal Dam and Reservoir, China <br />Meadows Dam and Reservoir. Savery_ <br />Pot Hook Project. Huntington Canyon <br />Generating Slation Unit No.1, and on <br />San Juan Generating Stalion Unit No_ <br />1. The Crystal Dam Final Environmental <br />Statement was amended. Preliminary <br /> <br />, <br />I" .... <br />work tor the preparation 01 an environ- <br />mental statement began on the lollow- /' <br />ing- Second Unit of Huntington Canyon~""""""" <br />Generating Station and 345-kv Trans- <br />mission Line, the Second Unit of San <br />Juan Generating Station, Curecanti- <br />Shiprock No.2 Transmission Line, <br />contract for sale of 125,000 acre. teet <br />at water from Fontenelle Reservoir to <br />the Slate of Wyoming for municipal and <br />industrial development. coal gasitica. <br />tion plants proposed by EI Paso Natural <br />Gas and Western Gasification. and <br />Four Corners Generating Stalion. In <br />September 1972 pUblic hearings were <br />held on the draft environmental state- <br />ments for the San Juan Generating <br />Station and the Bonneville Unit, Central --- _/ <br />Utah Project. <br /> <br />After review of the environmental im. <br />pacts associated with China Meadows <br />Dam and Reservoir. the Secretary <br />directed the Bureau 01 Reclamation to <br />conduct further investigations of water <br />use and to restudy alternatives to China <br />Meadows Dam. Depending on the re. <br />suits of the study, another environmen- <br />tal statement may be required before <br />the Secretary can propose one of the <br />alternative sites. <br /> <br /> <br />.~-' <br /> <br />..r <br />- ^ ,; <br /> <br />> <br />~- <br />---- <br />- <br /> <br />--- <br /> <br />- <br /> <br />L ----------- <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.