Laserfiche WebLink
<br /> <br />II!:~ <br /> <br />I <br />} <br /> <br />-j; <br />.,. <br /> <br />-= -. <br />'. <br />'x.~~., A <br />';;h\'I!,~~,'\ .. <br />,>',*,,:<'::", .'~ <br /> <br />~l <br /> <br />~. <br /> <br /> <br />, <br />I <br /> <br />, <br />, <br /> <br />;;';' <br />,.~,". <br />'- -~"'" ,~ <br />~""'f"""'~'" <br />~- " <br />-"f" ' <br />", <<:t,H:t. ~;:- <br /> <br />-- <br /> <br />., <br />, <br />I' <br />l. <br /> <br />- <br /> <br />Highway relocations were completed to <br />bypass the enlarged Strawberry Reser- <br />voir, Bonneville Unit. The highway <br />around Fontenelle Reservoir, Seedska- <br />dee Project, was rehabilitated. <br /> <br />Administration of recreation facilities on <br />Fontenelle Reservoir was assumed by <br />the Bureau of Reclamation in May 1973, <br /> <br />Siphon replacements on the Gould <br />Canal of the Fruitland Mesa Project <br />were completed. <br /> <br />Exploratory drilling of the Nambe Falls <br />Damsite (San Juan-Chama Project) was <br />completed and a contract was awarded <br />lor the access road. <br /> <br />Additions to the Water Filtration Plant <br />for the town of Page were completed <br />on the Glen Canyon Unit. <br />At Lemon Dam (Florida Project) ex- <br />tremely cold weather damaged con- <br />crete Spillway waifs and the stilling <br />basin. Emergency repairs will be under- <br />taken in Fiscal Year 1974. <br /> <br />Construction started on the Archer- <br />Weld 230-kv Transmission Une, Stage <br />02 of the Weld Substation. and Stage <br />02 of the Midway Substation. The loca- <br />tion study was completed for the CUre~ <br />canti-Shiprock Transmission UneNo. 2. <br /> <br />3 <br />