Laserfiche WebLink
<br />1973 fiSCAL YEAR HIGHLIGHTS <br /> <br />Construclion continued on the Crystal <br />Dam ollhe Curecanti UOIt and the Crys. <br />tal Diversion Tunnel was completed. <br /> <br />A "mole" drilled through Currant and <br />Layout Tunnels. Bonneville Unit. On <br />the Navajo Indian Irrigation Project. <br />mating was completed on Tunnels 3 <br />and 3A and was slarted on Tunnel <br />NO.4. <br />Navajo Reservoir water storage reach. <br />ad an all lime high and began spillin~ <br />for the lirsllime on Jun~25. 1973. <br />The first portion of the Jordan AquB-_ <br />duel of the Bonneville Unit, CentralOtah;..."l <br />Project, in Salt Lake Co~nty was sJb- <br />slanllaUy completed. I '.... <br /> <br />2 <br /> <br />if' <br />~ <br />r <br />I <br /> <br />, <br /> <br /> <br />I~ t <br />J <br />I <br /> I <br /> I <br /> I <br /> I <br />~~ <br /> <br />