My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10943
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:10:47 PM
Creation date
10/12/2006 4:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
1/17/1975
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 1
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and analytical areas; and (3) document all assumptions and methodologies. <br />To meet these three objectives, seven subactivities will be conducted <br />by the regional assessment participants. 1478 <br />Subactivity 5 - Review and Evaluation of Nationwide Analysis Results <br />The information and data furnished by the Water Resources Council <br />outlining the modified central case will be reviewed and analyzed by the <br />MRBC staff and will be utilized by the staff, in part, to evolve the <br />regional preference futures (subactivity 6). <br />Subactivity 6 - Develop the Regional Preference Future <br />The nationwide analysis (modified central case) results as well as <br />other sources of information will be utilized by the MRBC staff to evolve <br />the regional preference future. The MRBC staff will utilize such data <br />and information to display the extent of agreement or disagreement with <br />information contained in (1) the modified central case set of projections. <br />(2) the modified central case assumptions and methodologies, (3) the <br />adequacy analysis, and (4) the effects information as shown in Figure 5. <br />Subactivity 7 - Obtain Regionwide Review of the Regional Preference Future <br />The necessary information will be provided to the Group B participants <br />for a regionwide review of the regional preference future evolved in <br />subactivity 6. The inputs by the participants will be synthesized and <br />documented by the MRBC staff. <br />Subactivity 8 - Finalize the Regional Preference Future <br />The results of subactivities 6 and 7 will be compiled and analyzed <br />to'finalize the regional preference future and to display the results <br />including the projections, (socio-economic and associated land and water <br />uses) assumptions, methodologies, and effects information. The MRBC staff <br />will compile this information and data and present the results to the <br />Overview Committee for review and approval. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.