My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/'.' <br />I <br /> <br />Missouri Riler Basin Commission <br /> <br />John W. Neuberger <br />Chairman <br />Winiam C. Brabham, Iowa <br />Vice-Chairman <br /> <br />TO: <br />FROM: <br />SUBJECT: <br /> <br />Suite 403 . 10050 Regency Circle - Omaha, Nebraska 68114 <br />"A Presidential State-Federal River Basi~ii}m:14iWD' <br />M E M 0 RAN DUM VI: V L: <br />NOV 01 1974 <br />CONS~~~~'T WATER <br />Chai nnan, Executi ve Group, Framework Update Committee ION BOARD <br /> <br />Framework Update Committee <br /> <br />WRC Guidelines for Conducting Phase II of the Specific <br />Problem Analysis <br /> <br />DATE: <br /> <br />October 30, 1974 <br /> <br />For your reference while reviewing the Draft Memorandum of Agreement <br />(MOA) transmitted to you by a letter dated October 25, 1974, I have enclosed <br />the following materials which were received today: <br /> <br />. Guidelines for Conducting Phase II--Specific Problem Analysis <br />(September 1974) <br /> <br />. ~Appendices to Guidelines for Conducting Phase II of the Specific <br />Problem Analysis (September 1974) <br /> <br />These documents illustrate WRC's version of the work to be conducted by <br />the regional sponsors during the National Assessment and describe the products <br />that the regional sponsors will receive from the Nationwide Analysis. This <br />material should aid us in finalizing the MOA as well as providing information <br />concerning products from the Nationwide Analysis that may be used directly <br />in the Framework Update. <br /> <br />Please note the change in the MOA--Section III, Subscript A, page AI, of the <br />Appendices to the Guidelines. This change should be reflected in the regional <br />work agreement transmitted to you on October 25. <br /> <br />I hope these enclosures will help you prepare for the Framework Update <br />Committee meeting on November 5, 1974. <br /> <br />Yours truly, <br /> <br />~-t...~ <br />G'erifd R. Zirnmennan <br />Chairman, Executive Group <br />Framework Update Committee <br /> <br />1390 <br /> <br />GRZ/seh <br /> <br />cc: Director of PlannhllPMNIlft~ION MEMBERS <br /> <br />Colorado <br />Atomic Energy Commission <br />Iowa <br />Department of Commerce <br />Kansas <br />Department of Agriculture <br />Minnesota <br />Department of ~4m1.Y <br /> <br />State - FedeTal <br /> <br />MIssouri <br />Department of Health <br />Education and Welfare <br />Montana <br />Department of H Du.dng <br />and Urban Development <br />Nebraska <br />Department of 1 nterm <br /> <br />North Dakota <br />Department <br />of Transportation <br />South Dakota <br />Environmental <br />Protection Agency <br />Wyoming <br />Federal Power Commlssion <br /> <br />I <br />- -I.. <br /> <br />~---, <br />
The URL can be used to link to this page
Your browser does not support the video tag.